My WebLink
|
Help
|
About
|
Sign Out
Home
BKF Engineers CSA Amnd3 20240411
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
BKF Engineers CSA Amnd3 20240411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/4/2024 4:38:44 PM
Creation date
4/15/2024 5:01:17 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
4/11/2024
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Amendment No. 2 to Consulting Services Agreement between City of San Leandro and BKF Engineers for <br />Shoreline Park at the Marina <br /> Page 3 of 8 <br />EXHIBIT A (Amendment 2) <br />Scope of Work: <br />This contract is for 30% design of the project as described below. <br /> <br />Task 1: Project coordination and management <br /> Correspond with City as required to clarify work and get direction. <br /> Deliver direction to and coordinate work of the design team. <br /> Ensure the estimated cost of the design is within the construction estimate. <br />Deliverable: Meeting minutes <br />Schedule: As needed/ongoing <br /> <br />Task 2: Data Collection <br /> Review existing soils reports, utility information, and topographic surveys. <br /> Prepare updates to this information as required for the preparation of construction documents. <br />Prepare base sheets or backgrounds showing utility and topo information to be used when <br />preparing construction documents. <br /> Obtain and review plans for adjacent development when they are available. <br /> <br />Task 2.1: Collect topographic data underwater and along jetty slopes of the entire Marina enclosed by the <br />jettys as well as the outside slope of the jettys and extending approximately 30 feet beyond the toe of the <br />jettys. <br /> <br />Deliverable: Soils data (PDF); Topo and utility information on base sheets (Autocad compatible files) <br /> <br />Task 3: Update Existing Plans <br /> Meet with City to review plans created to date and comments received to date. <br /> Revise / develop plans that address staff input and public comments received in 2017. <br /> Develop an estimate for the construction cost of the work. <br /> Review plans with City. <br /> <br />Deliverable: Updated plans (PDF & Autocad files); Engineers cost estimate (Excel); Schedule (Microsoft <br />Project or equivalent file) <br /> <br />Task 4: Public Meetings <br /> Prepare presentation materials for public meetings. <br /> Highlight how plans respond to previous public input, include a list of requests that were not <br />incorporated. <br /> Review materials with City, incorporate comments. <br /> Attend and provide technical support at two identical public meetings. Meetings may be scheduled <br />on evenings and weekends. Meeting will be facilitated by City. Meetings may be in person or via <br />video conferencing software. <br /> Compile notes on input received at public meetings. <br /> Meet with City to discuss input. <br /> Add list of new public input to presentation material <br />DocuSign Envelope ID: B8CF9BF8-B13F-4598-8569-6EF1E405AD20DocuSign Envelope ID: 8072AF55-5E04-4E15-BB69-8A23564F49F9
The URL can be used to link to this page
Your browser does not support the video tag.