My WebLink
|
Help
|
About
|
Sign Out
Home
Environmental Declaration WPCP 20240409
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2024
>
Environmental Declaration WPCP 20240409
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2024 12:13:55 PM
Creation date
4/25/2024 1:12:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
4/9/2024
Recorded Document Type
Declaration
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L A SAN LEANDRO TREATMENT WETLAND PROJECT <br />r`. SA LEAN DROP ALAMEDA COUNTY, CALIFORNIA <br />2.2.2 Federally Listed Fish and Essential Fish Habitat Protection Measures <br />BIOLOGICAL ASSESSMENT <br />APRIL 2020 <br />The avoidance and minimization measures described below have been incorporated into the project <br />and will serve as mitigation measures to offset potential effects to the federally listed fish species <br />potentially present in the Action Area and to EFH. Most of these measures are adapted from the <br />NMFS Non fishing Impacts to Essential Fish Habitat and Recommended Conservation Measures <br />(Hanson et al. 2003). The following measures will be implemented for the proposed project. <br />2.2.2.1 General Endangered and Threatened Species Measures <br />Daylight Working. All work will be conducted during daylight hours, and no artificial illumination will <br />be used. <br />Work Areas. Personnel will limit their entry into the immediate vicinity of the project area. All <br />personnel and their equipment will be required to stay within the designated work areas to perform <br />job -related tasks and will be directed to stay out of surrounding areas. <br />In -water work will be performed at low tide when the outfall is exposed on the mud flat and will <br />occur outside the primary salmonid migration window (June 15 to November 30). If replacement <br />and/or major retrofits of the outfall are required, a cofferdam will be installed between the bank <br />where the outfall work will occur and the edge of the tidal slough. The cofferdam will be installed at <br />low tide when fish are not present and will be made of sand bags, clean gravel bags, sheet piles, or <br />other suitable material. The cofferdam will be installed to isolate the immediate work area from the <br />rest of the tidal slough, as well as to prevent sediment from flowing into the slough and from fish <br />entering the work area. <br />The following conservation measures will be implemented to reduce potential impacts to fish and <br />EFH: <br />■ When possible, in -water work shall be conducted at low tide when fish are not present. <br />■ If in -water work cannot be avoided, working outside of the primary salmonid migration window <br />(June 15 to November 30) will limit the presence of listed salmonids in the Action Area. Green <br />sturgeon can be present in the area year-round. <br />• The cofferdam shall be completely removed after completion of the in -water work. <br />The suspension of sediments and disturbance of the substrate shall be minimized. Measures to <br />help accomplish this include, but are not limited to, the following: <br />When practicable, the cofferdam shall be removed with a vibratory hammer, rather than <br />the direct pull or clamshell method. <br />The cofferdam shall be slowly removed to allow sediment to slough off at, or near, the <br />mudline. <br />16 <br />P:\TER2001\BA\$an Leandro Treatment Plant BA 4-7-20.docx (04/07/20) <br />
The URL can be used to link to this page
Your browser does not support the video tag.