My WebLink
|
Help
|
About
|
Sign Out
Home
Environmental Declaration WPCP 20240409
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2024
>
Environmental Declaration WPCP 20240409
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/15/2024 12:13:55 PM
Creation date
4/25/2024 1:12:37 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
4/9/2024
Recorded Document Type
Declaration
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
199
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. Environmental Checklist <br />■ Prior to vegetation removal, upland portions of the site shall be mowed for the purpose of <br />removing cover and encouraging salt marsh wandering shrew to seek cover in the areas <br />outside of the construction area. <br />After vegetation is removed, silt exclusion fencing with wire -mesh backing shall be installed by <br />hand along all tidal channels to prevent salt marsh wandering shrew from entering the active <br />work area, to protect adjacent habitat from construction activities or accidental spills, and to <br />exclude workers from adjacent habitat. <br />If a salt marsh wandering shrew is observed in or near the Project area, all construction shall <br />cease until the salt marsh wandering shrew is captured by a CDFW-approved biologist <br />possessing the appropriate permits and relocated to other suitable habitat on the Project site <br />in accordance with a pre -approved Sensitive Species Relocation Plan (SSRP). A brief SSRP <br />shall be submitted to and approved by the CDFW and USFWS prior to the re -initiation of any <br />Project activities. <br />The area beneath vehicles or equipment parked in the Project area shall be checked for the <br />presence of salt marsh wandering shrew before being moved, during construction, and during <br />movement of staging materials within the entire Project site. <br />■ Vehicle speed limits on the Project site shall not exceed 10 miles per hour. <br />Mitigation Measure BIO-2: Avoid and Minimize Impacts to Roosting Bats. <br />A qualified biologist shall conduct a pre -construction survey for roosting bats in all suitable bat <br />roosting habitat (large trees, concrete vault box) within the Project area within 14 days prior to the <br />beginning of Project -related activities. If active bat roosts are discovered or if evidence of recent prior <br />occupation is established, a buffer shall be established around the roost site until the roost site is no <br />longer active. If an active bat roost needs to be removed as part of the Proposed Project, the Project <br />biologist would need to consult CDFW to determine appropriate methods for the removal of the roost. <br />As part of CDFW's approval, a new roost site may need to be created on the Project site as mitigation. <br />Mitigation Measure BIO-3: Avoid and Minimize Impacts to Nesting Birds. <br />Project staging, Project construction, vegetation removal, or tree trimming should be performed <br />outside of the bird nesting season (February 1st through August 31st) to avoid impacts to nesting <br />birds; if these activities must be performed during the nesting bird season, a qualified biologist shall <br />be retained to conduct a pre- construction survey in the Project construction and staging areas for <br />nesting birds and verify the presence or absence of nesting birds no more than 14 days prior to <br />construction activities or after any construction breaks of 14 days or more. <br />Surveys shall be performed for the Project construction and staging areas and suitable habitat within <br />500 feet of the Project construction and staging areas, where accessible, to locate the presence of <br />nesting birds and raptors. If nesting birds and raptors do not occur within 250 and 500 feet of the <br />Project site, respectively, then no further action is required if construction begins within two weeks. <br />If active nests are located during the pre -construction bird nesting surveys, no -disturbance buffer <br />zones shall be established around nests, with a buffer size established by the qualified biologist. If the <br />survey indicates the presence of active nests, no -disturbance buffer zones shall be established around <br />the nests by the qualified biologist, as follows: <br />San Leandro Treatment Wetlana <br />IS/MND <br />
The URL can be used to link to this page
Your browser does not support the video tag.