Laserfiche WebLink
3. Environmental Checklist <br />Additional traffic resulting from the Proposed Project during the construction period would neither be <br />substantial relative to the existing traffic volume, nor disrupt traffic flows. Construction activities associated <br />with the Proposed Project occurring simultaneously with maintenance activities at the Oyster Bay Regional <br />Shoreline are not expected to be significant or disrupt local traffic circulation. However, this project has <br />established mitigation measures that include traffic control measures, which would reduce the potential for <br />conflicts with traffic associated with the Proposed Project. <br />San Leandro Treatment Wetland 3-63 February 2024 <br />IS/MND <br />