Laserfiche WebLink
Treatment Wetland Project Detailed Report, 2/14/202, <br />,.4.1. Construction Vehicle Control Strategies <br />Ion -applicable. No control strategies activated by user. <br />i.5. Architectural Coatings <br />1 - - <br />i.6. Dust Mitigation <br />-.6.1. Construction Earthmoving Activities <br />demo (Ph 1.2) 0.00 0.00 0.00 6,000 — <br />nitial Site Prep (PH 1.1) — — 22.5 0.00 — <br />3rading (Ph 1.3.1.5) 11,000 — 20.5 0.00 — <br />3rading (Ph 3.3) — 0.00 0.00 — <br />,.6.2. Construction Earthmoving Control Strategies <br />Ion -applicable. No control strategies activated by user. <br />i.7. Construction Paving <br />Area Paved (acres) <br />:ity Park 0.00 0 <br />1.8. Construction Electricity Consumption and Emissions Factors <br />Wh per Year and Emission Factor (lb/MWh) <br />kWh per Year <br />• <br />2024 0.00 204 0.03 < 0.005 <br />73/85 <br />