Laserfiche WebLink
MTC Programming & Allocations Section April. 2023 TDA Article 3 Model Resolution - Page 1 <br />Resolution No. 2024-042 <br />Page 1 of 2 <br />Attachment B <br />TDA Article 3 Project Application Form <br />1.Agency City of San Leandro <br />2.Primary Contact Sheila Marquises <br />3.Mailing Address 835 E. 14th Street San Leandro, CA 94577 <br />4.Email Address smarquises@sanleandro.org 5.Phone Number (510)577-3433 <br />6.Secondary Contact <br />(in the event primary <br />is not available) <br />Nicole Castelino <br />7.Mailing address (if <br />different) N/A☐ <br />835 E. 14th Street San Leandro, CA 94577 <br />8.Email Address nnoronha@sanleandro.org 9.Phone Number (510)577-3429 <br />10.Send allocation <br />instructions to (if <br />different from above): <br />11.Project Title Pedestrian Curb Ramp and Pedestrian Crossing Equipment <br />12.Amount requested $154,722 13.Fiscal Year of <br />Claim <br />2024-2025 <br />14.Description of Overall Project: <br />15.Project Scope Proposed for Funding: (Project level environmental, preliminary planning, and ROW <br />are ineligible uses of TDA funds.) <br />16.Project Location: A map of the project location is attached or a link to an online map of the <br />project location is provided below: <br />Installation of pedestrian curb ramps and crossing equipment to improve safety at various locations throughout the City. <br />This project will provide for the design, procurement, construction and inspection of pedestrian curb ramps and <br />pedestrian crossing equipment at various locations throughout the City. <br />Various locations in the City of San Leandro.