Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Bear Last revised 04/09/2024 <br />Engineering Group, Inc. for Annual Overlay/Rehabilitation 2019-21 Exhibit A – Page 1 of 1 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Project Description <br /> <br />The City of San Leandro is in the process of performing the construction of the Annual Street <br />Overlay/Rehabilitation 2019-2021 project, which includes cement treated base on three (3) street segments <br />in the project. <br /> <br /> <br /> <br />Description of Work <br /> <br />Consultant will provide construction support services as follows: <br />Observation and testing of the cement treatment process as required to ensure compliance with the design <br />intent. <br /> <br />Consultant will provide construction support services for streets within the project as follows: <br />• West Ave 130th <br />• Fordham Ave & Rollins St <br />• Flemming St <br /> <br />Deliverables: <br />1. Compaction test results for subgrade material. <br />2. Recommendations as needed during cement treatment process. <br />DocuSign Envelope ID: 4C618A0C-4C96-4028-A8D8-49B780819700