My WebLink
|
Help
|
About
|
Sign Out
Home
Agmt to Conds 2000 E 14th St 08122022
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2022
>
Agmt to Conds 2000 E 14th St 08122022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/26/2024 5:24:10 PM
Creation date
6/26/2024 4:43:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
8/12/2022
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
VI. CONSTRUCTION <br />A. Construction Hours. Construction activity shall not commence prior to 7:00 a.m. <br />- and shall cease by 7:00 p.m. Monday through Friday, and construction activity shall <br />not commence prior to 8:00 a.m. and shall cease by 7:00 p.m. on Sunday and <br />Saturday. No such construction is permitted on Federal holidays. As provided in <br />the City of San Leandro's Noise Ordinance (Ordinance Number 2003-005), <br />"construction" shall mean any site preparation, assembly, erection, substantial <br />repair, alteration, demolition or similar action, for or on any private property, public <br />or private right-of-way, streets, structures, utilities, facilities, or other similar <br />property. Construction activities carried on in violation of this Article may be <br />enforced as provided in Section 4-11-1130, and may also be enforced by issuance <br />of a stop work order and/or revocation of any or all permits issued for such <br />construction activity. <br />B. Construction Activity Containment. Construction activity shall not create dust, <br />noise, or safety hazards for adjacent residents, businesses and properties. Dirt and <br />mud shall not be tracked onto adjacent streets or surrounding streets from the <br />project site. <br />C. Construction Noise. Procedures with the highest noise potential shall be scheduled <br />for daylight hours, when ambient noise levels are highest. The contractor(s) shall <br />be required to employ the quietest among alternative equipment or to muffle/control <br />noise from available equipment. <br />VII. MAINTENANCE <br />A. Structures. All structures shall be structurally sound and well maintained at all <br />times; any damage to the structures shall be promptly repaired. <br />B. Graffiti. Any graffiti on the property shall be promptly removed. <br />C. Parking and Loading. All vehicle parking and loading for this project shall be <br />undertaken in a neat and orderly manner at all times. <br />D. Drop-off and Pick-up. A designated staff member shall be made available during <br />drop-off and pick-up times with a stop sign to direct traffic in the parking lot to and <br />from the day care facility. <br />E. Address Sign. The address sign(s) on the property shall be well maintained at all <br />times. Any damage to the signs shall be promptly repaired or replaced. <br />F. Signage. All signage shall be kept in a good, clean, sound condition at all times; <br />any damages shall be promptly repaired. Any change in signage proposed by the <br />applicant shall conform to Zoning Code Chapter 4.12 (Signs). <br />G. Temporary Sign. Unauthorized and temporary signage shall not be permitted on <br />the property, except as approved for a specified amount of time in a Temporary <br />Sign Permit granted by the Community Development Department. <br />PLN22-0016 2000 E 14th Street July 14, 2022 <br />CONDITIONS OF APPROVAL Page 5 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.