My WebLink
|
Help
|
About
|
Sign Out
Home
CSA_-_Terraphase_Engineering_Inc_-_Monarch_B (Executed)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
CSA_-_Terraphase_Engineering_Inc_-_Monarch_B (Executed)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 9:07:01 AM
Creation date
8/7/2024 9:06:51 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised 11/21/2022 <br />Terraphase Engineering, Inc for Soil Risk Analysis for MB Golf Course Project Exhibit A – Page 2 of 2 <br />This task will utilize RWQCB soil ESLs for Terrestrial Habitat – Significantly Vegetated. The evaluation will <br />incorporate the most recent regulatory screening criteria as well as any updates per current regulatory <br />agency (e.g., RWQCB, DTSC, Alameda County) soil import screening comments and criteria. <br />This task also includes coordination and communications with the City as well as project management <br />related activities. <br />This scope of work does not include on-site inspection, soil sampling, lab analysis, preparation of reports <br />not listed below, contractor/construction oversight, or coordination and meetings with regulatory agencies. <br />The scope of work does not include any regulatory agency fees. <br /> <br />Task 2 Deliverable <br /> <br />• Consultant will prepare an internal memorandum to the City summarizing results of the ir review <br />and independent screening evaluation for the import soil sources submitted for review. The <br />evaluation summary for the soil import sources will include a potential confirmation of each <br />respective soil import source with respect to material suitability for use at the Site or potential <br />recommendations for additional soil sampling and/or analysis (if required). <br /> Task 2 Delivery Date <br />• The draft Tech Memo will be completed within 3 weeks after submittal and after receipt of all <br />required import soil screening information. Completion of the Tech Memo will be contingent on <br />the receipt of all City comments and the extent and nature of City comments. <br /> <br /> <br /> <br />DocuSign Envelope ID: BD644FA8-71A4-41E9-89CF-3A7BD3DA23FEDocuSign Envelope ID: A7236BEB-C8CF-4AB0-94AF-FAEE0878C32A
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).