Laserfiche WebLink
<br />Consulting Services Agreement between City of San Leandro and Last revised 05/16/2024 <br />Local Artists Berkeley (LAB) for the Temporary Public Art Program at Hesperian Triangle Page 12 of 14 <br />sums paid to the Consultant. Consultant understands that, in addition to the foregoing, it <br />may be subject to criminal prosecution for a violation of California Government Code <br />Section 1090 et seq., and, if applicable, will be disqualified from holding public office in the <br />State of California. <br /> <br />At City’s sole discretion, Consultant may be required to file with the City a Form 700 to <br />identify and document Consultant’s economic interests, as defined and regulated by the <br />California Fair Political Practices Commission. If Consultant is required to file a Form 700, <br />Consultant is hereby advised to contact the San Leandro City Clerk for the Form 700 and <br />directions on how to prepare it. <br /> <br />10.8 Solicitation. Consultant agrees not to solicit business at any meeting, focus group, or <br />interview related to this Agreement, either orally or through any written materials. <br /> <br />10.9 Contract Administration. This Agreement shall be administered by Bill Sherwood <br />("Contract Administrator"). All correspondence shall be directed to or through the Cont ract <br />Administrator or his or her designee. <br /> <br />10.10 Notices. Any written notice to Consultant shall be sent to: <br />Rory Terrell <br />1814 Skillman Ln., Petaluma, CA 94952 <br />info@localartistsberkeley.org <br /> <br />Any written notice to City shall be sent to: <br />Bill Sherwood <br />San Leandro Public Library, 300 Estudillo Ave., San Leandro, CA 94577 <br />bsherwood@sanleandro.org <br /> <br />With a copy to: <br />City of San Leandro <br />Department of Finance <br />c/o Purchasing Agent <br />835 East 14th Street <br />San Leandro, CA 94577 <br /> <br />10.11 Professional Seal. Where applicable in the determination of the contract administrator, <br />the first page of a technical report, first page of design specifications, and each page of <br />construction drawings shall be stamped/sealed and signed by the licensed professional <br />responsible for the report/design preparation. The stamp/seal shall be in a block entitled <br />"Seal and Signature of Registered Professional with report/design responsibility," as in the <br />following example. <br /> <br /> <br /> <br /> <br /> <br />_________________________________________ <br /> <br /> <br />DocuSign Envelope ID: 4F235B4C-B996-465F-B39B-91E6535FC129