My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Garland PWSC and History Museum Roof Repairs.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
NPSA Garland PWSC and History Museum Roof Repairs.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/7/2024 9:12:15 AM
Creation date
8/7/2024 9:12:00 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between <br />City of San Leandro and GARLAND/DBS, INC. Page 12 of 17 <br /> <br />8.2 Extension. City may, in its sole and exclusive discretion, extend the end date of this <br />Agreement beyond that provided for in Subsection 1.1. Any such extension shall require a <br />written amendment to this Agreement, as provided for herein. Contractor understands and <br />agrees that, if City grants such an extension, City shall have no obligation to provide <br />Contractor with compensation beyond the maximum amount provided for in this <br />Agreement. Similarly, unless authorized by the Contract Administrator, City shall have no <br />obligation to reimburse Contractor for any otherwise reimbursable expenses incurred <br />during the extension period. <br /> <br />8.3 Amendments. The Parties may amend this Agreement only by a writing signed by all the <br />Parties. <br /> <br />8.4 Assignment and Subcontracting. City and Contractor recognize and agree that this <br />Agreement contemplates personal performance by Contractor and is based upon a <br />determination of Contractor’s unique personal competence, experience, and specialized <br />personal knowledge. Moreover, a substantial inducement to City for entering into this <br />Agreement was and is the professional reputation and competence of Contractor. <br />Contractor may not assign this Agreement or any interest therein without the prior written <br />approval of the Contract Administrator. Contractor shall not subcontract any portion of the <br />performance contemplated and provided for herein, other than to the subcontractors noted <br />in the proposal, without prior written approval of the Contract Administrator. <br /> <br />8.5 Survival. All obligations arising prior to the termination of this Agreement and all <br />provisions of this Agreement allocating liability between City and Contractor shall survive <br />the termination of this Agreement. <br /> <br />8.6 Options upon Breach by Contractor. If Contractor materially breaches any of the terms <br />of this Agreement, and fails to remedy such breach within five (5) days after written notice <br />from the City’s remedies shall include, but not be limited to, the following: <br /> <br />8.6.1 Immediately terminate the Agreement; <br /> <br />8.6.2 Retain the plans, specifications, drawings, reports, design documents, and any <br />other work product prepared by Contractor pursuant to this Agreement; <br /> <br />8.6.3 Retain a different contractor to complete the work described in Exhibit A not <br />finished by Contractor; or <br /> <br />8.6.4 Charge Contractor the difference between the reasonable cost to complete the <br />work described in Exhibit A that is unfinished at the time of breach and the amount <br />that City would have paid Contractor pursuant to Section 2 if Contractor had <br />completed the work. <br /> <br />Section 9. KEEPING AND STATUS OF RECORDS. <br /> <br />Docusign Envelope ID: 63402776-1199-42D7-87E8-649840160918
The URL can be used to link to this page
Your browser does not support the video tag.