My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Monterey Mechanical for Tide Gate Repairs 2024
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
NPSA Monterey Mechanical for Tide Gate Repairs 2024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 10:56:10 AM
Creation date
8/7/2024 9:12:26 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
6/3/2024
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between June 3, 2024 <br />City of San Leandro and Monterey Mechanical —Exhibit A Page 4 of 4 <br />adequate or suitable for Contractor’s operations. Contractor shall evaluate the staging area provided and <br />secure any additional staging area needed. <br />TRAFFIC CONTROL AND ACCESS: Contractor shall not completely obstruct public pedestrian <br />pathways or deny access to private property at any time. No streets shall be closed at any time. The <br />Contractor may establish “No Parking” zones, contiguous to the work area by posting signs. The City will <br />enforce parking restrictions only when the Contractor has posted the proper signs and has notified the <br />City Police Department a minimum of 48 hours in advance of the required restriction period. <br />Adequate warning devices, barricades, guards, flagmen or other necessary precautions shall be taken by <br />the contractor to give advised and reasonable protection, safety and warning to persons and vehicular <br />traffic concerned in the area. Construction signs, lights, barricades, etc., shall conform to the latest <br />revision of the Manual of Warning Signs, Lights and Devices for Use in Performance of Work Upon <br />Highways, by California Department of Transportation. <br />Contractor is required to submit a Traffic Control Plan and obtain an encroachment permit prior to <br />commencing work. Contact the Engineering and Transportation Department at 510-577-3428 for <br />assistance. <br />UNKNOWN OBSTRUCTIONS: Should any unknown obstruction be encountered during their contract the <br />Contractor immediately bring it to the attention of the City. The contractor shall be responsible for the <br />protection of all existing equipment, furniture, or utilities encountered within the work area. <br />WAGES: This contract requires the payment of prevailing wages for the State of California or the City <br />of San Leandro Living Wage whichever is higher. Additional provisions are outlined in Section 1.5 and <br />Exhibit D of the Non-Professional Services Agreement. <br /> <br />QUOTATION ON NEXT PAGE <br /> <br /> <br /> <br /> <br />DocuSign Envelope ID: A01E2378-A15E-4827-9091-1CC1DA19E230
The URL can be used to link to this page
Your browser does not support the video tag.