My WebLink
|
Help
|
About
|
Sign Out
Home
Watertight Restoration NPSA 05202024.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Watertight Restoration NPSA 05202024.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 10:46:40 AM
Creation date
8/7/2024 9:14:17 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
5/21/2024
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between 5/21/2024 <br />City of San Leandro and Watertight Restoration Inc.—Exhibit A Page 1 of 1 <br /> <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />1. Furnish/Install polyurethane foam injection repairs at areas deemed necessary based <br />on job site visit. Area of focus appears to be cold joint locations of Primary Clarifier <br />#2. See attached pictures. <br /> <br /> <br /> <br />2. Seal surface with surface sealer (BASF Waterplug), install ports leaking <br />sections, and inject foam port to port to complete. <br />3. Surface sealer to be BASF Waterplug. Polyurethane foam material to be Prime <br />Resins Prime Flex 900 XLV. <br />4. Installation to be per manufacturer’s recommendations, industry standards, <br />and contract documents. <br />5. Work to be performed will have a minimum charge of 8 hours/technician/day. <br />6. Watertight will also demo a small section of asphalt that is adjacent to tank walls. <br />Repaving/sloping new asphalt to be by others. <br /> Water may migrate to adjacent locations and require additional injections at a later time. <br /> Any items in way of work including plates/conduit/etc. may need to be <br />removed/reinstalled (by others). This includes metal stair set in picture. <br /> Proposal includes 1 tech for one eight hours shift for demo asphalt section. Also <br />includes 2 technicians for one eight hour shift for foam injection work and includes up <br />to 10 gallons of polyurethane foam material. <br /> <br /> <br />DocuSign Envelope ID: 3C1898FD-B090-4676-965F-BD57CD509184
The URL can be used to link to this page
Your browser does not support the video tag.