Laserfiche WebLink
INSPECTION CHECKLIST <br />BIORETETION AREA <br />Date: <br />Inspector Name: <br />Bioretention Area ID#: <br />Frequency: refer to Table 1 of Routine Maintenance Activities for Bioretention Areas and <br />Frequency of Task in Exhibit C for details. <br />DESCRIPTION <br />YES <br />NO <br />ACTION ITEMS <br />1. Obstructions, debris and trash from bioretention <br />area were removed and disposed properly. <br />2. Bioretention area was drained between storms <br />and dry within five days after rainfall. <br />3. Inlets are free from soil exposure or other <br />evidence of erosion. Obstructions were cleared <br />I) and sediment was removed. <br />4. All dead and diseased vegetation were removed <br />and replaced. <br />5. Vegetation and the irrigation system were <br />maintained. Bioretention area is neat and orderly <br />II <br />r\ arann <br />in apNea� .,e. <br />6. That mulch is at appropriate depth (3 inches per <br />soil specifications) and replenish as necessary <br />.fore wet season begins <br />Note: If NO column is marked, then fill in the ACTION ITEMS column what need to be <br />immediately corrected. <br />