My WebLink
|
Help
|
About
|
Sign Out
Home
Stormwater Treatment Measures & Hydromodification Management Controls Maint. Agreement 2024105500
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2024
>
Stormwater Treatment Measures & Hydromodification Management Controls Maint. Agreement 2024105500
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/18/2024 12:18:21 PM
Creation date
11/5/2024 4:15:01 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
8/28/2024
Recorded Document Type
Stormwater Treatment
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bioretention Area Inspection and Maintenance Checklist <br />Property Address: 1-00 Halcyon Dr San Leandro.. CA <br />Date of Inspection: <br />Treatment Measure No.: <br />Bioretention Area Maintenance Plan for <br />100 Halcyon Dr. San Leandro, CA 94578 <br />8/26/2017 <br />Assessor's Parcel No.: 077C-1315-002, 077C-1240-002, 077C-1235-004-03 <br />Property Owner: 100 Halcyon Owners, LLC Phone No.: <br />Contact: <br />Phone No.: <br />Designated <br />Mailing Address: <br />The property contains thirteen bioretention area(s), located as described below and as shown in the <br />attached site plan'. <br />• Bioretention Area No. 1 is located at the northwest corner of the site. <br />• Bioretention Area No. 2 is located at the northeast corner of the site and northwest of BMP 4. <br />• Bioretention Area No. 3 is located on the east end of the site, and southwest of BMP 4.. <br />• Bioretention Area No. 4 is located at the east corner of the site. <br />• Bioretention Area No. 5 is located at the west end of the site, north of BMP 9. <br />• Bioretention Area No. 6 is located at the east end of the site, just west of BMP 3. <br />• Bioretention Area No. 7 is located at the center of the site, north of BMP 10. <br />• Bioretention Area No. 8 is located at the eastern end of the site, south of BMP 3. <br />• Bioretention Area No. 9 is located at the southwestern corner of the site, just southeast of BMP 13.. <br />• Bioretention Area No. 10 is located at the south end of the site, south of BMP 7. <br />• Bioretention Area No. 11 is located at the east corner of the site, just south of BMP 12. <br />• Bioretention Area No. 12 is located at the east corner of the site, adjacent to Halcyon Dr. <br />• Bioretention Area No. 13 is located at the southwest corner of the site, north of Halcyon Dr. <br />' Attached site plan must match the site plan at Exhibit B to this Stormwater Maintenance Agreement <br />
The URL can be used to link to this page
Your browser does not support the video tag.