Laserfiche WebLink
<br />RESOLUTION NO. 2024-151 14 <br />Engineering and Infrastructure Improvements <br />Development Impact Fees <br />64. Underground Utility District Master Plan Fee. East 14th Street is included in the City’s adopted <br />Underground Utility District Master Plan, as such an in-lieu fee is required. The estimated amount of the fee <br />is $54,501.37 which is calculated at $465.82 per linear foot frontage (117 LF per assessor’s map 77D). This <br />undergrounding overhead utility conversion fee will be included in the Building Permit issuance fees. These <br />fees are subject to change at the start of each fiscal year on July 1 and will not be vested until issuance of a <br />building permit. <br />65. Development Fee for Street Improvements. The City’s traffic impact fee program is called “Development <br />Fee for Street Improvements” (DFSI). According to the adopted 2023-24 Fee Schedule, the rate for “General <br />Residential” land use is $1,854.89 per unit. Assuming 9 units, the total DFSI fee is an estimated amount of <br />$16,694.01. These fees are subject to change at the start of each fiscal year on July 1 and will not be vested <br />until issuance of a building permit. <br />66. Marina Boulevard/Interstate 880 Interchange Traffic Impact Fee. The project is within the Marina <br />Boulevard/Interstate 880 Interchange Traffic Impact Fee Zone. According to the adopted 2023-24 Fee <br />Schedule, the rate for “General Residential” land use is $926.03 per unit. Assuming 9 units, the total Marina <br />Boulevard/Interstate 880 Interchange Traffic Impact fee is an estimated amount of $8,334.27. These fees <br />are subject to change at the start of each fiscal year on July 1 and will not be vested until issuance of a <br />building permit. <br />67. Park Facilities Development Impact Fee. A Park Facilities Development Impact Fee for a proposed use of <br />“Multi-Family” shall be assessed on this project. According to the adopted 2023-24 Fee Schedule, assuming <br />9 dwelling units, the Park Facilities Development Impact Fee is an estimated amount of: <br />Park Land Acquisition Fee: $15,988.00/du or $143,892.00 <br />Park Improvement Fee: $2,760.00/du or $24,480.00 <br />Total Park Impact Fee: $18,748.00/du or $168,732.00 <br /> <br />These fees are subject to change at the start of each fiscal year on July 1 and will not be vested until issuance <br />of a building permit. <br />Ongoing Maintenance required by Engineering <br />68. Storm Water Pollution. The Applicant/Property Owner shall reduce storm water pollution by implementing <br />the following pollution source control measures: <br />a. Structures shall be designed to discourage the occurrence and entry of pests into buildings, thus <br />minimizing the need for pesticides. The trash area shall be separated from the rest of the building by <br />concrete or masonry walls so that pests that gain access to the area are less likely to access the rest of <br />the building. <br />b. All storm drains shall be marked “NO DUMPING, DRAINS TO BAY”. <br />c. All on-site storm drains shall be inspected and, if necessary, cleaned at least twice a year immediately <br />prior to the rainy season.