My WebLink
|
Help
|
About
|
Sign Out
Home
Stormwater Treatment Measures & Hydromodification Management Controls Maintenance Agreement 2024136958
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2025
>
Stormwater Treatment Measures & Hydromodification Management Controls Maintenance Agreement 2024136958
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2025 3:24:14 PM
Creation date
1/24/2025 3:23:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
11/6/2024
Recorded Document Type
Agreement to Conditions
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ANNUAL REPORT <br />Treatment Measure Operation and Maintenance <br />Inspection Report to the <br />Public Works Director <br />City of San Leandro <br />14200 Chapman Road <br />San Leandro, CA 94578 <br />This report and attached inspection checklists document the inspection and maintenance conducted for the <br />identified stormwater treatment measure(s) subject to the Maintenance Agreement between the City and the <br />property owner during the annual reporting period indicated below. <br />Property Information: <br />Property Address or APN: 903 Manor Boulevard, San Leandro, CA 94579 <br />Property Owner: D.R. Horton Bay, Inc., a Delaware Corporation <br />II. Contact Information: <br />Name of person to contact regarding this report: Chris Zaballos <br />Phone number of contact person: (925) 285-7990 Email: CPZaballos(&drhorton.com <br />Address to which correspondence regarding this report should be directed: <br />6683 Owens Drive, Pleasanton, CA 94588 <br />III. Reporting Period: <br />This report, with the attached completed inspection checklists, documents the inspections and maintenance <br />of the identified treatment measures during the time period from January 1 to December 31 , annually. <br />IV. Treatment Measure Information: <br />The following stormwater treatment measures (identified treatment measures) are located on the property <br />identified above and are subject to the Maintenance Agreement: <br />Identifying <br />Number of <br />Treatment <br />Measure <br />Type of Treatment Measure <br />Location of Treatment Measure on the <br />Property <br />13 <br />Bio-retention <br />Refer to map, Exhibit B <br />2 <br />Silva cell <br />Refer to map, Exhibit B <br />11 <br />G:\job2018\181066\AdminkStormwater O&M Manual\181066-O&M Agreement.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.