My WebLink
|
Help
|
About
|
Sign Out
Home
FeyerLaureta (CSA)_ Floresta 03.2025.rev (2)
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
FeyerLaureta (CSA)_ Floresta 03.2025.rev (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/14/2025 8:33:53 AM
Creation date
4/14/2025 8:33:46 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Consulting Services Agreement between City of San Leandro and Last revised March 2025 <br />Freyer & Laureta, Inc. for Floresta Sewer Replacement Exhibit A – Page 1 of 2 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Project Description <br />This project involves the study and design for replacing a section of the sewer main that crosses <br />Floresta Blvd. between Anza Way and Figueroa Drive. The existing pipeline is a 10” diameter <br />vitrified clay pipe (VCP) pipe that runs through private properties and beneath Floresta Blvd. At <br />this location, Floresta Blvd. is an elevated embankment near the abutment of the I-880 overpass. <br /> <br />Scope of Services <br />Consultant shall provide Engineering and Surveying Services for the replacement of the sewer <br />main section crossing Floresta Blvd. The scope of services includes the following: <br /> <br />Task I. Project Management and Coordination <br />• Freyer & Laureta (F&L) will attend meetings for project coordination. Three (3) <br />meetings are budgeted. <br />• F&L will provide QA/QC and monitor schedule and budget. <br /> <br />Task II: Site Investigation, Data Collection, Research/Study <br />• Conduct topographic survey of the pipe section along Anza, Figueroa, and Floresta, <br />including area where the sewer main crosses private properties. <br />o Surveys will be performed at 20-scale. <br />o City assist with providing access to the private properties. <br />• Establish vertical control based on the NAVD 88 benchmark. <br />• Survey sanitary sewer MHs, documenting inverts and pipe sizes for all entering and <br />exiting pipes. <br />• Collect data on SD structures, including inverts, pipe sizes and direction of flows for <br />storm drain lines, manholes, and catch basins. <br />• Identify and map visible surface features, including driveways, utilities, and existing <br />U.S.A. markings. <br />• Conduct utility research, incorporating interpreted utility locations from utility company <br />system drawings into survey base. <br />• Convert all survey data into AutoCad drawings for use in design development. <br /> <br />Task III. Preparation of Plans, Specifications, and Estimates <br />• Review CCTV videos to identify areas of pipe failure and non-functioning service <br />connections. <br />• Perform additional site reconnaissance to support design efforts. <br />• Prepare construction documents incorporating the selected replacement option <br />coordinated with the City. <br />o Submittal Process: <br />• F&L will prepare two review submittals, 60% and 90%, and a final submittal. <br />o 60% Submittal: includes Plans, Technical Specifications, and Preliminary <br />Anticipated Cost Estimate. <br />Docusign Envelope ID: 0FA4A17A-64A7-4D30-AABD-AA8046E1F0AC
The URL can be used to link to this page
Your browser does not support the video tag.