My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA Control Air City Hall Boiler Pump P-2 Replacement.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
NPSA Control Air City Hall Boiler Pump P-2 Replacement.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/19/2025 4:52:21 PM
Creation date
4/14/2025 8:34:48 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Document Date (6)
3/25/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between <br />City of San Leandro and Control Air Enterprises, LLC—Exhibit B Page 1 of 2 <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br /> <br />Scope of Work: <br /> Isolate the pump and LOTO the power <br /> Disconnect 120v power from existing pump <br /> Unbolt flanges and remove existing pump <br /> Thread on new flanges to pipe <br /> Install new gaskets in pump and sealed with the never leak <br /> Mount new pump in place and bolt to flanges <br /> Wire power to new pump <br /> Un-isolate pump from the loop and ill <br /> Run pump once the loop is filled, to confirm functionality <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Docusign Envelope ID: E69B38C9-9006-4553-AF87-05E63D99F4F4
The URL can be used to link to this page
Your browser does not support the video tag.