My WebLink
|
Help
|
About
|
Sign Out
Home
NPSA ACCO GIS Pump Install 2025 02 03.docx
CityHall
>
City Clerk
>
City Council
>
Agreements
>
2025
>
NPSA ACCO GIS Pump Install 2025 02 03.docx
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/5/2025 12:23:49 PM
Creation date
5/5/2025 12:23:41 PM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Agreement
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Non-Professional Services Agreement between April 4, 2025 <br />City of San Leandro and ACCO Engineered Systems—Exhibit A Page 1 of 1 <br /> <br />EXHIBIT A <br /> <br />SCOPE OF SERVICES <br /> <br />Lift Pump Can Procurement. Lift Pump Can and Pump Installation <br />Project Overview – Procurement and installation of a like-for-like pump can, concrete kicker, soil <br />backfill, shoring removal, concrete pedestal installation, pump installation, pump bolt up, copper <br />drain line reconnection, and off haul/dispose of stockpiled soil <br /> Procure like-for-like pump can, hardware, gaskets and, miscellaneous material <br />(disposal of the original pump can is included) <br /> Install the pump can in the previously excavated area of work utilizing the existing <br />piping points of connection <br /> Pour a concrete kicker at the base of the pump can <br /> Backfill; the work area with recycled AB <br /> Removal of the rental shoring <br /> Installation of an 4’x4’x1’ concrete pedestal <br /> Installation of the existing pump into the pump can <br /> Pump bolt up to the existing piping points of connection <br /> Reconnection of an existing copper drain line <br /> Off haul and disposal of the old pump can, misc. materials <br /> All stockpiled soil will either be relocated on site or off hauled to an approved disposal facility <br />General Provisions and Clarifications: <br /> All work is to be performed during normal working hours on a continuous <br />working schedule coordinated with the customer. <br /> Any repairs or modifications to the lift pump itself are excluded from this scope. <br /> Electrical and pump startup are excluded and the responsibility of the customer. <br /> Restoration of landscaping or surface areas disturbed during excavation is excluded <br />unless explicitly stated otherwise. <br /> Any unforeseen site conditions requiring additional work beyond the scope outlined <br />are excluded and may incur additional costs. <br /> Abatement, if found, is not included in the above scope of work. <br /> Any items not specifically listed above are excluded. <br /> ACCO will not be responsible for any pre-existing conditions which are not currently in compliance <br />with local mechanical and electrical codes. <br /> It is assumed that there is no permitting required for this effort. <br /> <br /> <br />Docusign Envelope ID: 4FA9DF4B-3C55-43BB-9E07-A811FCCDE185
The URL can be used to link to this page
Your browser does not support the video tag.