Laserfiche WebLink
<br />RESOLUTION NO. 2025-042 12 <br />or Special Event Permit. The use of spotlights, feather signs, animated or inflatable signs, balloons, <br />and lasers shall be prohibited at all times. <br />55. Enforcement. Construction activities carried on in violation of these Conditions may be enforced as <br />provided in the San Leandro Municipal Code and may be enforced by issuance of a stop work order <br />and/or revocation of any or all permits issued for such construction activity. <br />Airport Land Use Compatibility <br />56. Construction cranes used for construction shall be no more than 140 feet in height. <br />57. The use of a construction crane shall be limited to approximately three weeks. <br />58. The Applicant/Property Owner shall notify the Operations Manager of the Oakland International <br />Airport and the FAA Airport Traffic Control Tower at least five days in advance of bringing the <br />construction crane to the project site. <br />59. All associated activities with the Airport Operations Manager and Airport Traffic Control Tower shall <br />be coordinated to ensure the appropriate local Notice to Air Missions are issued. <br />60. The construction equipment/crane shall be lowered when not in operation or when weather is below <br />FAA Visual Flight Rules (VFR) minimums, as directed by the Airport Operations Manager or Airport <br />Traffic Control Tower. <br />61. Additional coordination and crane modifications shall be implemented as determined by either the <br />Airport Operations Manager or Airport Traffic Control Tower should either determine the crane is <br />impacting the airport’s radar system. <br />62. The Applicant/Property Owner shall notify the Airport Operations Manager and Airport Traffic Control <br />Tower at least five business days before the construction equipment/crane is permanently lowered <br />and removed from the site. <br />63. The construction/equipment crane shall be lowered and/or illuminated during nighttime hours <br />(between sunset and sunrise), in accordance with applicable FAA Advisory Circulars. <br />64. At the Airport Operations Manager’s or Airport Traffic Control Tower’s direction, the <br />Applicant/Property Owner shall lower the construction equipment/crane during adverse weather <br />conditions or below VFR minimum that impact airport operations. <br />65. The Applicant/Property Owner shall provide the Port of Oakland with a primary and secondary <br />contact person who is available 24 hours per day and is authorized to address any issue regarding <br />construction equipment/crane height, during the construction period/crane deployment. <br />66. The Applicant/Property Owner shall deploy the construction equipment/crane only as needed and <br />preferably during periods of good visibility, above VFR minimums, as determined by the Airport