Laserfiche WebLink
<br />RESOLUTION NO. 2025-042 20 <br />resource in coordination with the appropriate local Native American tribal representative and, if <br />applicable, a qualified archaeologist. The plan shall include measures to ensure the find is treated in <br />a manner that respectfully retains, to the degree feasible, the qualities that render the resource of <br />significance to the local Native American group(s). Examples of appropriate mitigation for tribal <br />cultural resources include, but are not limited to, protecting the cultural character and integrity of <br />the resource, protecting traditional use of the resource, protecting the confidentiality of the resource, <br />or heritage recovery. <br />ENGINEERING AND TRANSPORTATION REQUIREMENTS <br />81. Protest Within a 90-day Period. Pursuant to Government Code Section 66020, including Section <br />66020 (d) (1), the City HEREBY NOTIFIES the Applicant and/or Property Owner for this Project that the <br />90-day approval period (in which the Applicant and/or Property Owner may protest the imposition of <br />any fees, dedications, reservations, or other exactions imposed on this Project by these Conditions <br />of Approval) will begin on the date of the conditional approval of this Project. If the Applicant and/or <br />Property Owner fails to file a protest within this 90-day period, complying with all the requirements of <br />Government Code Section 66020, the Applicant and/or Property Owner will be legally barred from <br />later challenging any such fees, dedications, reservations or other exactions. <br />82. Compliance. The proposed development shall comply with City ordinances, policies and <br />regulations. All improvements shall be in accordance with the City’s Design Standards, <br />Specifications and Standard Plans unless otherwise specifically approved by the City Engineer. <br />83. Grading Permit. A Grading Permit is necessary for this project. The requirements for said permit are <br />indicated in San Leandro Municipal Code §7-12. The permit will be issued prior to or concurrent with <br />the Building Permit. <br />84. Encroachment Permit from Engineering and Transportation. A portion of the work within the <br />Public Right-of-Way shall require an Encroachment Permit from the Engineering and Transportation <br />Department prior to beginning such work. <br />85. Lot Line Adjustment Application. The Applicant and/or Property Owner shall submit a Lot Line <br />Adjustment application for the merger of the two parcels at the project site. The Lot Line Adjustment <br />must be approved and recorded prior to issuance of the Building Permit and Grading Permit. <br />86. Utility Removal. Utility laterals and services to be abandoned shall be entirely removed and capped <br />at the main line. <br />87. Utility Underground. Utility services to the site shall be placed underground. <br />88. Retaining Structures. Any retaining structures along the property line shall be constructed from <br />durable materials such as reinforced concrete or concrete blocks. Any such structures shall be <br />constructed entirely on the subject property, unless appropriate easements and permissions are <br />obtained from the neighboring properties. Drainage systems along the new retaining structures shall <br />direct water to nearest onsite stormwater system and/or follow the existing drainage patterns for the