My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2025-042 Rejecting Appeal (880 Doolittle)
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2025
>
Reso 2025-042 Rejecting Appeal (880 Doolittle)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 9:50:06 AM
Creation date
5/21/2025 9:50:01 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/5/2025
Retention
PERM
Document Relationships
8B Public
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2025\Packet 20250505
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. 2025-042 23 <br />96. Site Plan. The applicant shall submit photometric site plan. <br />97. Traffic Impact Fee. The City’s traffic impact fee program is called “Development Fee for Street <br />Improvements” (DFSI). According to the adopted 2022-23 Fee Schedule, the rate for “General <br />Industrial” is $1.53 per gross building square foot with an equivalent credit offered for the prior use. <br />Assuming 239,573 SF of proposed building square footage and 218,947 SF of existing building <br />“General Industrial” the net square footage used for the fee calculation will be 20,626 SF. The DFSI <br />fee estimate for the 2022-23 fiscal year is $31,557.78. The DFSI fee is due prior to issuance of the <br />building permit and is subject to change each fiscal year. <br />98. Marina Boulevard/I-880 Fee. The Project is within the Marina Boulevard/Interstate 880 Interchange <br />Traffic Impact Fee Zone. According to the adopted 2022-23 Fee Schedule, the rate for “General <br />Industrial” is $1.12 per gross building square foot with an equivalent credit offered for the prior use. <br />Assuming 239,573 SF of proposed building square footage and 218,947 SF of existing building <br />“General Industrial” the net square footage used for the fee calculation will be 20,626 SF. The Marina <br />Boulevard/Interstate 880 Interchange Traffic Impact Fee estimate for the 2022-23 fiscal year is <br />$23,101.12. The fee is due prior to issuance of the building permit and is subject to change each fiscal <br />year. <br />99. Davis-Doolittle Fee. The Project is within the Davis-Doolittle Zone 4 Traffic Impact Fee Zone. <br />According to the adopted 2022-23 Fee Schedule, the rate for “General Industrial” is $0.12 per gross <br />building square foot with an equivalent credit offered for the prior use. Assuming 239,573 SF of <br />proposed building square footage and 218,947 SF of existing building “General Industrial” the net <br />square footage used for the fee calculation will be 20,626 SF. The Marina Boulevard/Interstate 880 <br />Interchange Traffic Impact Fee estimate for 2022-23 is $2,475.12. The fee is due prior to issuance of <br />the building permit and is subject to change each fiscal year. <br />WATER POLLUTION CONTROL REQUIREMENTS <br />100. Prior to the issuance of a building permit, Applicant shall pay sewer connection fees in effect at time <br />of submittal. <br />ALAMEDA COUNTY FIRE DEPARTMENT REQUIREMENTS <br />101. Plans shall meet Building and Fire Codes adopted at time of building plan submittal. <br />102. A Deferred Submittal will be required for the fire protection system (fire sprinklers), to be noted on the <br />submitted building plans. <br />103. A Deferred Submittal will be required for the fire alarm monitoring system, to be noted on the <br />submitted building plans. <br />104. A Deferred Submittal is required for the installation of an underground fire line, to be noted on the <br />submitted building plans.
The URL can be used to link to this page
Your browser does not support the video tag.