My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2025-042 Rejecting Appeal (880 Doolittle)
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2025
>
Reso 2025-042 Rejecting Appeal (880 Doolittle)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2025 9:50:06 AM
Creation date
5/21/2025 9:50:01 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
5/5/2025
Retention
PERM
Document Relationships
8B Public
(Amended by)
Path:
\City Clerk\City Council\Agenda Packets\2025\Packet 20250505
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. 2025-042 4 <br />3. Scope of Work. The approval of this Administrative Site Plan Review, Conditional Use Permit, and <br />Administrative Exception (Height) is for the construction and operation of a new 50-foot-tall <br />approximately 244,573-square-foot warehouse/distribution facility on two lots totaling 14.14 acres <br />located at 880 Doolittle Drive. Alameda County Assessor’s Parcel Numbers 77A-0741-004-02, 77A- <br />0741-005-00. <br />4. Approved Use. This Conditional Use Permit authorizes “Warehouse— Storage Facilities” and/or <br />“Warehouse—Wholesale/Retail Distribution Facilities” uses as currently defined in Chapter 1.12.108 <br />of the Zoning Code, throughout the project site, which are conditionally permitted in the IG Zoning <br />District. Use intensities authorized by this Conditional Use Permit shall not exceed the relevant <br />thresholds of significance identified in the Environmental Impact Report, at the determination of the <br />Zoning Enforcement Official. If the use intensities exceed the significant thresholds in the <br />Environmental Impact Report, a modification of this use permit and additional environmental review <br />may be required. <br />5. Substantial Compliance. The Project shall remain in substantial compliance with the approved <br />Plans, Exhibits, and Conditions of Approval. Building elevations, site plan, and landscaping shall be <br />consistent with the approved plans for the site. Proposed changes to the project shall be made in <br />writing to the Zoning Enforcement Official. The Zoning Enforcement Official may approve changes to <br />approved exhibits or Conditions of Approval without a public hearing upon determining that the <br />changes are minor and are consistent with the intent of the original approval. <br />6. Compliance with Zoning Code. The Project shall comply with all requirements of the San Leandro <br />Zoning Code. <br />7. Effective Date. The project approval shall become effective on the 15th day after the date the <br />Planning Commission approves the project, unless appealed, as provided in Zoning Code Chapter <br />5.20 Appeals. <br />8. Expiration. The Project approval shall lapse two years after the date of approval of the Project, unless <br />a grading permit or building permit has been issued, coupled with diligent progress evidencing good <br />faith intention to commence the intended use, an occupancy permit has been issued, or the approval <br />is granted a one-year extension by the Zoning Enforcement Official upon receipt of a written <br />application with the required fee prior to the expiration of the approval. <br />9. Access to Conditions of Approval. These Conditions of Approval shall be available and accessible <br />to all tenants, employees and vendors on the property. <br />10. Fees. Any outstanding Planning, Engineering or Building deposit fees or balances shall be paid prior <br />to permit issuance. The Applicant/Property Owner shall pay all applicable development, permitting, <br />and plan checking fees in accordance with the fee schedules in effect at the time of the Building <br />Permit approval. <br />11. Demonstration of Compliance. Prior to permit issuance, the Applicant/Property Owner shall <br />demonstrate that the Project complies with applicable minimum objective standards and criteria of
The URL can be used to link to this page
Your browser does not support the video tag.