Laserfiche WebLink
PC Resolution No. 2024-XXX November 7, 2024 <br /> <br /> <br /> <br /> <br />PLN23-0031 Attachment 1 - Page 5 of 15 440 Peralta Avenue <br />annotation shall include a standard reference to the specific sheet(s) and drawing(s) <br />of the construction plans that demonstrate such compliance, and information about <br />who will be completing each requirement. Construction plans for building permit <br />issuance shall not be accepted without the Annotated Conditions of Approval <br />document. <br />16. Cell Tower Camouflaging. <br />a. Camouflaging Plan. Prior to issuance of building permits, the Applicant/Owner <br />shall provide a Cell Tower Camouflaging Plan for review and approval of the <br />Zoning Enforcement Official, including all of the following, incorporated as part of <br />the building permit plan set, on its own sheet: <br />i. Indicate what species of tree will be designed with the camouflaging <br />material and demonstrate how the design will mimic the tree’s natural shape <br />and adequately conceal the equipment/antennas mounted on the monopole. <br />ii. Paint underlying surfaces with colors matching the bark and branches of the <br />proposed monopine. Provide a paint specification using brand and brand <br />color name. <br />iii. Provide a variety of different branch types and lengths, to create a natural- <br />looking shape. Provide installation details on elevation drawings and plan <br />drawings at key elevations (each antenna level, between antennas, and <br />around the microwave antennas, depict the branches and dimension their <br />lengths. Indicate how camouflaging (bark, socks, and antennas) will be <br />installed, relative to equipment (i.e., antennas, radios units, microwaves, <br />etc.). <br />iv. Indicate who will install the camouflaging material, including company name, <br />and representative name and information. <br />v. Indicate who will maintain the camouflaging and at what frequency. Include <br />including company name, and representative name and information. <br />b. Materials Board. Prior to issuance of building permits, the Applicant/Owner shall <br />provide a final materials board, for review and approval by the Zoning <br />Enforcement Official that includes materials samples for all materials that will be <br />used for camouflaging. <br />c. Inspection of Camouflaging Materials. Prior to final inspection, the <br />Applicant/Owner shall demonstrate that the required camouflaging has been <br />installed on the cell tower. The Applicant/Owner shall request an inspection by <br />the Planning Division and shall make any adjustments required by the Zoning <br />Enforcement Official, as needed to meet the intent of these Conditions of <br />Approval. <br />17. Landscaping Plan. Prior to issuance of building permits, the Applicant/Owner shall <br />provide Final Landscape and Irrigation Plans for review and approval of the Zoning <br />Enforcement Official. The plans shall document compliance with applicable Zoning