My WebLink
|
Help
|
About
|
Sign Out
Home
8A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250121
>
8A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 2:03:11 PM
Creation date
9/8/2025 3:58:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/21/2025
Retention
Perm
Document Relationships
Reso 2025-008 Rejecting Appeal (PLN24-0040)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PLN23-0031 440 Peralta Ave <br />Code Section Development Regulation Proposed Complies? <br />right-of-way or adjacent non-industrial zone. Preferred fencing <br />materials shall consist of wood, tubular steel or other architecturally- <br />appropriate fencing material. <br />4.04.376(F)(7) <br />7.Landscaping. Facilities shall be landscaped with a buffer of <br />plant materials that effectively screens the view of the facility from <br />adjacent off-site properties. Wireless telecommunications facilities <br />adjacent to residential uses shall incorporate landscaping that will <br />maximize screening of the site from those residences. The standard <br />buffer shall consist of a landscaped strip at least five feet wide <br />outside the perimeter of the facility to provide a visual buffer of any <br />ground-mounted ancillary equipment. These requirements may be <br />waived by the Zoning Enforcement Official if the goals of this section <br />would be better served thereby. Consideration shall also be given to <br />the fact that vegetation can impede radio-frequency signals. <br />Vines will cover the masonry wall. <br />Corner side yard along San Leandro <br />Blvd is also already landscaped. <br />Yes <br />4.04.376(F)(8) <br />8.Signage. All wireless telecommunications facilities shall post a <br />sign in a readily visible location identifying the name and phone <br />number of a party to contact in the event of an emergency. No signs, <br />flags, banners, or any form of advertising shall be attached to a <br />wireless telecommunications facility except for government-required <br />certifications, warnings, or other required seals or signs. <br />Standard signage and warning signs, <br />per recommendations of the EME <br />report. <br />COA <br />4.04.376(F)(9) <br />9.Federal and State Requirements. All wireless <br />telecommunications facilities must meet or exceed current standards <br />and regulations of the FAA, the FCC, the California Public Utilities <br />Commission and any other agency of the Federal or State <br />government with the authority to regulate wireless <br />telecommunications facilities. If such standards and regulations are <br />changed, then the owners of the wireless telecommunications <br />facilities governed by this section shall bring such wireless <br />telecommunications facilities into compliance with such revised <br />standards and regulations within six months of the effective date of <br />such standards and regulations, unless a more stringent compliance <br />schedule is mandated by the controlling Federal or State agency. <br />Failure to bring wireless telecommunications facilities into <br />compliance with such revised standards and regulations shall <br />constitute grounds for the removal of the wireless <br />telecommunications facilities at the owner’s expense. <br />FCC license for this new cell site will <br />be obtained after construction. COA <br />Att C - Att 3 - Page 3 of 3
The URL can be used to link to this page
Your browser does not support the video tag.