My WebLink
|
Help
|
About
|
Sign Out
Home
8A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250121
>
8A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 2:03:11 PM
Creation date
9/8/2025 3:58:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/21/2025
Retention
Perm
Document Relationships
Reso 2025-008 Rejecting Appeal (PLN24-0040)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC Resolution No. 2024-010 November 7, 2024 <br />d.Provide accessible clearances for all accessible spaces per 2022 CBC <br />Chapter 11A. <br />e.Provide pedestrian gates for driveway gates, if used shall comply 2022 CBC <br />Chapter 11A. <br />f.All exterior walking surfaces shall be ADA compliant. <br />g.Information provided on civil plans such as accessible path of travel, accessible <br />parking, utilities, and exterior lighting locations shall be shown on architectural <br />site plan. <br />ALAMEDA COUNTY FIRE DEPARTMENT <br />56. The Project shall comply with Building and Fire Codes adopted and in effect at the <br />time of building permit submittal. <br />PLANNING COMMISSION REQUIREMENTS <br />57.As required by Zoning Code Section 4.04.376.J.13, within 30 calendar days of <br />activation of the facility, the Applicant/Owner shall submit a Radio-Frequency <br />Compliance Report demonstrating that the facility meets the FCC standards for <br />radio-frequency emissions. Additionally, the Applicant/Owner shall complete a <br />Radio-Frequency Compliance Report annually for five years after the approval of <br />this project. The report shall be delivered to the Planning Division on the anniversary <br />of the approval. <br />58. If a future Radio Frequency Emissions report identifies that the project violates the <br />FCC standards within any adjacent or neighboring residential building, <br />Applicant/Owner shall adjust facility equipment until the emissions in the residential <br />building do not exceed FCC standards. <br />PASSED, CONDITIONALLY AP P ROVED, AND ADOPTED, on this 7th day of <br />November 2024 by the following vote: <br />AY ES: Boldt, Mendoza, Rich, Solis, Tejada, Tabjulu, Zuber <br />NOES: None <br />ABSENT: None <br />ABSTAIN: None <br />Litha Zuber <br />Chair of the Planning Commission <br />PLN23-0031 Page 15 of 16 440 Peralta Avenue Att D - Page 15 of 41
The URL can be used to link to this page
Your browser does not support the video tag.