My WebLink
|
Help
|
About
|
Sign Out
Home
8A Public Hearings
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250121
>
8A Public Hearings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 2:03:11 PM
Creation date
9/8/2025 3:58:27 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
1/21/2025
Retention
Perm
Document Relationships
Reso 2025-008 Rejecting Appeal (PLN24-0040)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
228
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />RESOLUTION NO. 2025-XXX 11 <br />Section 66020, the Applicant/Owner will be legally barred from later challenging any such fees, <br />dedications, reservations or other exactions. <br />44. Compliance. The proposed development shall comply with City ordinances, policies and <br />regulations. All improvements shall be in accordance with the City’s Design Standards, <br />Specifications and Standard Plans unless otherwise specifically approved by the City Engineer. <br />Additional Submittals to be Submitted to Engineering <br />45. Geotechnical Investigation Report. The Applicant/Owner shall submit a Geotechnical <br />Investigation Report and shall incorporate all recommendations into the design. A letter from the <br />engineer who prepared the geotechnical investigation report stating they have reviewed the <br />proposed improvement plans and that it substantially conforms with the recommendations made <br />in the report will be required. <br />46. Encroachment Permit from Engineering Division. Any work within the Public Right-of-Way shall <br />require an Encroachment Permit from the Engineering and Transportation Division of the Public <br />Works Department prior to beginning such work. Please visit the following website for more <br />information on the City’s Encroachment Permit process: https://www.sanleandro.org/953/Permits. <br />Engineering and Infrastructure Improvements <br />47. Utility Easement. AT&T and/or Tower Engineering Professionals shall be responsible for obtaining <br />the required private utility and access easements from the private property owner. <br />48. Utility Underground. Utility services to the site shall be placed underground. <br />49. Storm Drain. All proposed storm drain inlets and trench drains shall be marked “NO DUMPING, <br />DRAINS TO BAY” as per the City of San Leandro Standard Plan Dwg. No. 204. Install Regional Water <br />Quality Control Board (RWQCB) approved trash inserts at the proposed storm drain inlets prior to the <br />connection of the existing storm drain line. See the most recent approved list located here: <br />https://www.waterboards. <br />ca.gov/water_issues/programs/stormwater/docs/trash_implementation/certified_fcsdevicelist_16Fe <br />b2021.pdf <br />Ongoing Maintenance required by Engineering <br />50. Storm Water Pollution. The Applicant/Owner shall reduce storm water pollution by implementing <br />the following pollution source control measures: <br />a. Structures shall be designed to discourage the occurrence and entry of pests into buildings, thus <br />minimizing the need for pesticides. The trash area shall be separated from the rest of the building <br />by concrete or masonry walls so that pests that gain access to the area are less likely to access <br />the rest of the building. <br />b. All storm drains shall be marked “NO DUMPING, DRAINS TO BAY”. DRAFT
The URL can be used to link to this page
Your browser does not support the video tag.