Laserfiche WebLink
CITYWIDE ROAD <br />FUNDING NEEDS <br />0.5 mi LAKE CHABOT ROAD REPAIR COSTS AMOUNT <br />(est.) <br />Slide 1 and Slide 4 Repair Costs (estimate)$3M <br />Stabilize Erosion Sites 2 and 3 (estimate)$6M <br />Reconstruct Pavement (estimate)$2M <br />Total $11M <br />CITYWIDE ROAD REPAIR NEEDS AMOUNT <br />43 miles of Failed roads (red, PCI<25)$96 <br />26 miles of Poor roads (orange, PCI<50)$51M <br />29 miles of Fair roads, (yellow, PCI<65)$18M <br />Total (98 miles)$165M <br />City Council Meeting 22February 3, 2025 <br />Lake Chabot Road PCI = 37 (poor, orange)