My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250505
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 9:24:57 AM
Creation date
9/15/2025 10:35:01 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/5/2025
Retention
Perm
Document Relationships
Reso 2025-040 CSA NPSA Univar Solutions WCPC
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
operations must be hauled away and lawfully disposed of at no charge to the agency where the delivery is <br />being made. The property where the delivery is being made must not be used for such disposal. If the spill <br />is NOT cleaned up, the City will hire a certified hazardous material handling company to clean up the spill, <br />and the costs incurred, including any fines or penalties which may be imposed by regulating authorities, will <br />be charged to the Contractor or deducted from amounts owed. Chemicals must stay i n the possession of <br />the Contractor and must not be unloaded until accepted by the Contract Administrator or their designee. All <br />chemicals must be delivered in accordance with Department of Transportation regulations. <br /> <br />Delivery Requirements <br />All deliveries require the following: <br />A. Bill of lading <br />B. Certificate of Analysis <br />C. Weighmaster’s certificate of weight <br />D. Applicable regulatory documents <br />Failure to produce the above listed item may result in a rejection of the delivery <br /> <br />Any delays in delivery must be notified at least 24 hours in advance of delivery date and time. <br />Persistently late or cancelled deliveries (defined as three or more over the contract period) may be used as <br />a basis for contract termination. Failure to provide notice of late delivery may also be a basis for contract <br />termination. Any deliveries not meeting chemical quality, regulatory, safety, or delivery requirements will be <br />returned to the Contractor at no cost to the City, and must be re -delivered by the Contractor within 48 hours <br />of the unacceptable delivery. <br />
The URL can be used to link to this page
Your browser does not support the video tag.