My WebLink
|
Help
|
About
|
Sign Out
Home
5B Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250505
>
5B Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 9:24:57 AM
Creation date
9/15/2025 10:35:01 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/5/2025
Retention
Perm
Document Relationships
Reso 2025-040 CSA NPSA Univar Solutions WCPC
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1692799v1 <br /> <br /> BAY AREA CHEMICAL CONSORTIUM <br />STANDARD AGREEMENT, PAGE 1 OF 2 <br />BID NO. 13-2025 <br />SUPPLY AND DELIVERY OF SODIUM HYPOCHLORITE 12.5% <br /> <br /> <br />I hereby agree to furnish SODIUM HYPOCHLORITE 12.5% identified in the attached bid forms, as solicited <br />by the Bay Area Chemical Consortium (BACC), to one or more of the participating BACC Agencies. <br /> <br />Company: __________________________________________ <br />Address: __________________________________________ <br />City, State, ZIP: _________________________________________ <br />Phone: __________________________________________ <br />Email: __________________________________________ <br />Authorized Representative: ________________________________ <br />Signature: __________________________________________ <br />Date: __________________________________________ <br /> <br />WE ACKNOWLEDGE RECEIVING ADDENDUM/ADDENDA NUMBER ______ THROUGH ______. <br /> <br />SPECIFIC DEVIATIONS: <br /> This box must be checked if bidder has any proposed specific deviations. Per Section 2.12 <br />Proposed Deviations from the Specifications by the Bidder, the absence of a proposed changed in <br />the specifications will hold the bidder strictly accountable to the specifications as described in the <br />bid document, including any addendum. <br /> <br />Describe the specific deviations below. A copy of the proposed specifications must be attached to this <br />Standard Agreement at the time of submission, with bidder’s name clearly shown on each document. <br /> <br /> <br /> <br /> <br /> <br /> <br />Description of Emergency Supply Plan: Provide a summary of vendor’s plans to continue to supply <br />product in the event of an unexpected disaster or urgent emergency event. <br /> <br /> <br /> <br /> <br />49
The URL can be used to link to this page
Your browser does not support the video tag.