My WebLink
|
Help
|
About
|
Sign Out
Home
8B Public
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250505
>
8B Public
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 9:28:03 AM
Creation date
9/15/2025 10:35:54 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/5/2025
Retention
Perm
Document Relationships
Reso 2025-042 Rejecting Appeal (880 Doolittle)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Reso 2025-043 Certifying EIR (880 Doolittle)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5995
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Table of Contents <br /> <br />Environmental Impact Report iii <br />Table 4.1-3 Project Consistency with the San Leandro Climate Action Plan ................................ 4.1-11 <br />Table 4.3-1 Groundborne Vibration Architectural Damage Thresholds ....................................... 4.3-11 <br />Table 4.3-2 Estimated Noise Levels by Project Construction Phase ............................................. 4.3-12 <br />Table 4.3-3 Estimated Construction Vibration Levels (in/sec PPV) .............................................. 4.3-19 <br />Table 6-1 Impact Comparison of Alternatives .............................................................................. 6-15 <br />Figures <br />Figure 1-1 Environmental Review Process .................................................................................. 1-13 <br />Figure 2-1 Regional Location......................................................................................................... 2-2 <br />Figure 2-2 Project Site Location .................................................................................................... 2-3 <br />Figure 2-3 Existing Site Conditions: Representative Photographs ................................................ 2-5 <br />Figure 2-4 Conceptual Site Plan .................................................................................................. 2-10 <br />Figure 2-5 Conceptual Building Elevations ................................................................................. 2-11 <br />Figure 2-6 Conceptual Rendering of Project ............................................................................... 2-12 <br />Figure 2-7 Preliminary Utility Plan .............................................................................................. 2-15 <br />Figure 2-8 Conceptual Grading Plan ........................................................................................... 2-16 <br />Figure 4.2-1 On-Site Groundwater Well Network ........................................................................ 4.2-3 <br />Figure 4.2-2 Soil Management Areas ............................................................................................ 4.2-5 <br />Figure 4.3-1 City of San Leandro Land Use Compatibility Noise Guidelines ................................. 4.3-8 <br />Figure 4.3-2 Estimated Rooftop HVAC Noise Levels near Project Site ....................................... 4.3-14 <br />Figure 4.3-3 Estimated Truck Operations and HVAC Noise Levels near Project Site: North Side of <br />Building ................................................................................................................... 4.3-15 <br />Figure 4.3-4 Estimated Truck Operations and HVAC Noise Levels near Project Site: East Side of <br />Building ................................................................................................................... 4.3-16 <br />Figure 4.3-5 Estimated Truck Operations and HVAC Noise Levels near Project Site: South Side of <br />Building ................................................................................................................... 4.3-17 <br />Appendices <br />Appendix A Initial Study <br />Appendix B Notice of Preparation (NOP) and NOP Comment Letters <br />Appendix C Transportation Impact Analysis <br />Appendix D Revised Soil and Groundwater Management Plan <br />Appendix E Evaluation of Site Sound Emissions <br />Appendix F Noise Letter Report
The URL can be used to link to this page
Your browser does not support the video tag.