Laserfiche WebLink
City of San Leandro <br />880 Doolittle Drive Industrial Project <br /> <br />ES-16 <br />Impact Mitigation Measure (s) Residual Impact <br />damaged during ground-disturbing <br />activities required for project <br />construction. Impacts to tribal <br />cultural resources would be reduced <br />to less than significant with <br />implementation of Mitigation <br />Measure TCR-1. <br />American origin are identified during project construction, <br />all earth-disturbing work within 50 feet of the find shall be <br />temporarily suspended or redirected until an <br />archaeologist has evaluated the nature and significance of <br />the find as a cultural resource and an appropriate local <br />Native American representative is consulted. If the City, in <br />consultation with local Native American tribes, <br />determines that the resource is a tribal cultural resource <br />and thus significant under CEQA, a mitigation plan shall be <br />prepared and implemented in accordance with state <br />guidelines and in consultation with local Native American <br />group(s). The plan shall include avoidance of the resource <br />or, if avoidance of the resource is infeasible, the plan shall <br />outline the appropriate treatment of the resource in <br />coordination with the appropriate local Native American <br />tribal representative and, if applicable, a qualified <br />archaeologist. The plan shall include measures to ensure <br />the find is treated in a manner that respectfully retains, to <br />the degree feasible, the qualities that render the resource <br />of significance to the local Native American group(s). <br />Examples of appropriate mitigation for tribal cultural <br />resources include, but are not limited to, protecting the <br />cultural character and integrity of the resource, protecting <br />traditional use of the resource, protecting the <br />confidentiality of the resource, or heritage recovery. <br /> <br />