My WebLink
|
Help
|
About
|
Sign Out
Home
8B Public
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250505
>
8B Public
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 9:28:03 AM
Creation date
9/15/2025 10:35:54 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/5/2025
Retention
Perm
Document Relationships
Reso 2025-042 Rejecting Appeal (880 Doolittle)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Reso 2025-043 Certifying EIR (880 Doolittle)
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5995
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />880 Doolittle Drive Industrial Project <br /> <br />ES-16 <br />Impact Mitigation Measure (s) Residual Impact <br />damaged during ground-disturbing <br />activities required for project <br />construction. Impacts to tribal <br />cultural resources would be reduced <br />to less than significant with <br />implementation of Mitigation <br />Measure TCR-1. <br />American origin are identified during project construction, <br />all earth-disturbing work within 50 feet of the find shall be <br />temporarily suspended or redirected until an <br />archaeologist has evaluated the nature and significance of <br />the find as a cultural resource and an appropriate local <br />Native American representative is consulted. If the City, in <br />consultation with local Native American tribes, <br />determines that the resource is a tribal cultural resource <br />and thus significant under CEQA, a mitigation plan shall be <br />prepared and implemented in accordance with state <br />guidelines and in consultation with local Native American <br />group(s). The plan shall include avoidance of the resource <br />or, if avoidance of the resource is infeasible, the plan shall <br />outline the appropriate treatment of the resource in <br />coordination with the appropriate local Native American <br />tribal representative and, if applicable, a qualified <br />archaeologist. The plan shall include measures to ensure <br />the find is treated in a manner that respectfully retains, to <br />the degree feasible, the qualities that render the resource <br />of significance to the local Native American group(s). <br />Examples of appropriate mitigation for tribal cultural <br />resources include, but are not limited to, protecting the <br />cultural character and integrity of the resource, protecting <br />traditional use of the resource, protecting the <br />confidentiality of the resource, or heritage recovery. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.