Laserfiche WebLink
BUILDING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />ii) For Master Plans (i.e. identical buildings built by the <br />same builder on the same lot or in the same tract and <br />for which building permits are issued at the same time) <br />Master Plan when more than one building will be <br />built each Full Plan Check <br />Fee Applies <br /> Full Plan Check <br />Fee Applies <br />Each production phase building at time of <br />application each 33% of Plan <br />Check Fee 584$ $ 584 <br />iii. OTC plan checks for Minor Residential Remodels per permit NEW 767$ $ 767 <br />iv) Changes, revisions, or additions to plans previously <br />approved and issued <br />per hour, 1 <br />hour min [6]209$ 212$ $ 212 <br />v) Additional plan review after the first re-check per hour, 1 <br />hour min [6]209$ 212$ $ 212 <br />vi) Alternate Methods and Materials <br />Under $10M in construction valuation per request [6]209$ 531$ $ 531 <br />Over $10M in construction valuation per request [6]209$ 1,062$ $ 1,062 <br />vii) Energy Conservation - for all buildings and projects <br />subject to the California Energy Commission’s <br />conservation regulations <br /> 20% of building <br />permit fee <br />$1 - $5,000 per permit 42$ 319$ $ 319 <br />5,001$ base fee @ <br />$5,001 42$ 319$ $ 319 <br />each additional $1000 or fraction thereof each add'l <br />$1000 12.55$ 31.86$ $ 31.86 <br />10,001$ base fee @ <br />10,001 105$ 478$ $ 478 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 3.66$ -$ $ - <br />50,001$ base fee @ <br />$50,001 251$ 478$ $ 478 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 3.35$ 1.06$ $ 1.06 <br />100,001$ base fee @ <br />$100,001 418$ 531$ $ 531 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 2.72$ 0.93$ $ 0.93 <br />500,001$ base fee @ <br />$500,001 1,506$ 903$ $ 903 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 1.00$ 0.32$ $ 0.32 <br />1,000,001$ base fee @ <br />$1,000,001 2,008$ 1,062$ $ 1,062 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 0.95$ 0.13$ $ 0.13 <br />5,000,000$ base fee @ <br />$5,000,001 5,816$ 1,593$ $ 1,593 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 0.95$ 0.13$ $ 0.13 <br />10,000,000$ base fee @ <br />$10,000,001 10,576$ 2,230$ $ 2,230 <br />each additional $1000 or fraction thereof each add'l <br />$1,000 0.95$ 0.10$ $ 0.10 <br />50,000,000$ base fee @ <br />$50,000,001 48,656$ 6,266$ $ 6,266 <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />Building <br />25 of 69