Laserfiche WebLink
BUILDING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />Notes <br />[1] <br />[2] <br />[3] <br />[4]Sign permit fees are based on all signs being on the same property and on the same permit. <br />[5] <br />[6]1 hour minimum. <br />[7]2 hour minimum. <br />[8] <br />[9] <br />[10] <br />[11]Fee charged as a percentage of permit fee. <br />[12]CA Gov't Code 36900 <br />[13]Set by State <br />Note: For small tenant improvements to existing buildings and ADUs, the Chief Building Official and/or the Community Development <br />Director may waive the Community Planning Fee at his/her discretion. <br />Community Planning Fee will not be charged for the following project types: permits for accessory dwelling units; stand-alone <br />mechanical, plumbing, and electrical permits; minor residential remodels, and; minor tenant improvements. <br />Determination of Valuation for Fee-Setting Purposes: Valuation shall be based on total value of all construction work, as determined by <br />the Building Official, including all finish work, roofing, electrical, plumbing, heating, air conditioning, elevators, fire-extinguishing systems <br />and any other permanent equipment). For new construction project valuations which the Building Official believes are understated at <br />submittal, valuation may be determined using the most current International Code Council (ICC) valuation table modified to account for a <br />regional construction cost modifier of 16% or the most currently available regional construction cost modifier (i.e. construction value in <br />ICC Table * 1.16). For tenant improvement, residential remodels, or other projects that do not involve new square footage project <br />valuations which the Building Official believes are understated at submittal, valuation may be determined using, up to 50% of, the most <br />current International Code Council (ICC) valuation table modified to account for a regional construction cost modifier of 16% or the most <br />currently available regional construction cost modifier (i.e. up to 50% of construction value in ICC Table * 1.16.) <br />Note: The Building Official may adjust the plan checking/permit fee for an individual project when costs to the City are not congruent <br />with this fee schedule. <br />Note: For photovoltaic systems, total permit fees, including applicable Permit Issuance and Filing Fees, Automation Fees, Community <br />Planning Fees, and other mandated fees shall not exceed amounts authorized via Government Code Section 66015. <br />Plan checking fee shall be paid at the time of application for a building permit. The plan checking fee is in addition to the building permit <br />fee. <br />Note: Payment of any investigation fees does not exempt any person from compliance with all other provisions of applicable codes in the <br />execution of the work nor from any other penalties prescribed by law. <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />Building <br />28 of 69