My WebLink
|
Help
|
About
|
Sign Out
Home
8D Public
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250505
>
8D Public
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 9:31:02 AM
Creation date
9/15/2025 12:18:19 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
5/5/2025
Retention
Perm
Document Relationships
Ord 2025-004 Business License Tax for 2025-26
(Amended)
Path:
\City Clerk\City Council\Ordinances\2025
Ord 2025-005 Emergency Medical Services Tax for 2025-26
(Amended)
Path:
\City Clerk\City Council\Ordinances\2025
Ord 2025-006 Emergency Communications System Access Tax for 2025-26
(Amended)
Path:
\City Clerk\City Council\Ordinances\2025
Reso 2024-044 Stormwater Fee Amendment
(Amended)
Path:
\City Clerk\City Council\Resolutions\2024
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS - ENGINEERING <br />Fee <br />No.Fee Name Fee Unit / <br />Type Notes Current Fee / <br />Deposit <br />FY 25-26 Rec'd <br />Fee Level / <br />Deposit <br />100% Cost <br />Recovery <br />Fee <br />TRAFFIC DIVISION <br />1 Vertical Curb Striping Costs <br />A. Driveway Approach Red Tipping Colored Curb striping up to <br />10'each $ 65 498$ 498$ <br />ea. additional > 10'per ft. $ 6.50 37$ 37$ <br />B. Public Service Directional Sign (DELETED)per hour $ 65.00 249$ <br />C. Other Services (i.e. neighborhood traffic calming projects) <br />(DELETED)per hour Direct Costs 249$ <br />2 No Parking Signs per pc. $ 2 2$ <br />3 Special Study Review (Oversize and overload route review, Traffic <br />Management Plan review)deposit New 4,983$ 4,983$ <br />4 Residential Parking Permit Program (MOVED to PARKING)[5] <br />A. First regular annual parking permit per permit $ 20 20$ <br />B. Second regular annual parking permit per permit $ 40 40$ <br />B. Visitor Permits per permit $ 10 10$ <br />Notes <br />[1]Park Development Fees created with Reso. 2000-64, and amended with Reso. 2005-069 & Reso. 2019-074. <br />[2] <br />[3] <br />[4]Includes 3 reviews. Additional reviews will be charged time and materials and the balance will be collected prior to permit issuance. <br />[5]The applicable project inspection fee shall be the total permit inspection fee of all work performed under the permit. <br />Impact fee for ADUs 750 sq. ft. or larger shall be charged proportionately in relation to the size of the primary dwelling unit, per CA Gov't <br />Technology Fee does not apply to the following fees: (1.C) Parklet Program, (1.I) News Rack Permits, (3) Building Permit review costs by <br />Engineering staff, (4) Large Format Copies, (5) Park Facilities Development Impact Fees, (6.E) & (6.F) Grading Permit Performance and <br />City of San Leandro <br />Master Fee Schedule <br />Proposed <br />PW - Engineering <br />42 of 69
The URL can be used to link to this page
Your browser does not support the video tag.