My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250602
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 10:23:16 AM
Creation date
9/15/2025 2:40:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
6/2/2025
Retention
Perm
Document Relationships
Reso 2025-060 Raposo Engineering
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />BID OPENING Raposo Engineering, Inc. <br />DATE: May 8, 2025 2613 Erskine Lane <br />TIME: 3:00 pm Hayward, CA 94545 <br />LOCATION: City Clerk's Office Phone: (650) 622-6152 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST <br />BASE BID <br />1 CONSTRUCTION SURVEYING PER <br />SECTION 2-9.2 <br />1 LS $4,500.00 $4,500.00 $23,000.00 $23,000.00 <br />2 CONCRETE WASHOUT AREA PER <br />SECTION 7-8.6 <br />250 SF $2.00 $500.00 $3.20 $800.00 <br />3 INLET PROTECTION PER SECTION <br />7-8.6 <br />1 EA $1,500.00 $1,500.00 $3,500.00 $3,500.00 <br />4 STABILIZED CONSTRUCTION <br />ENTRANCE/EXIT PER SECION 7-8.6 <br />800 SF $4.00 $3,200.00 $6.25 $5,000.00 <br />5 TEMPORARY CONSTRUCTION <br />FENCE WITH DUST CONTROL <br />SCREENS PER SECTION 7-8.6 <br />395 LF $5.00 $1,975.00 $12.15 $4,799.25 ** <br />6 FIBER ROLLS PER SECTION 7-8.6 561 LF $2.00 $1,122.00 $6.23 $3,495.03 ** <br />7 EQUIPMENT MOBILIZATION AND <br />DEMOBILIZATION (NOT TO EXCEED <br />10% OF TOTAL BID) PER SECTION 9- <br />3.4 <br />1 LS $27,000.00 $27,000.00 $20,000.00 $20,000.00 <br />8 PEA GRAVEL (AT ART) PER <br />SECTION 200-1.3 <br />100 SF $4.00 $400.00 $46.00 $4,600.00 <br />9 REMOVE EXISTING TREES PER <br />SECTION 300-1 <br />2 EA $2,500.00 $5,000.00 $3,500.00 $7,000.00 <br />10 CLEARING AND GRUBBING PER <br />SECTION 300-1 <br />3254 SF $1.00 $3,254.00 $14.85 $48,321.90 <br />11 ROUGH GRADING-CUT PER <br />SECTION 300-2 <br />1 LS $11,270.00 $11,270.00 $15,897.00 $15,897.00 <br />Prepared by: Adrian Toscano <br />Date Approved: 4/11/25 <br />This document is a summary of bids received for the subject project and are <br />provided only as a convenience. Listing of a particular bid is not a finding that <br />such bid has been found to be responsive or accepted as complete by the City. <br />An award of contract, if any, is subject to approval of the City Council and/or the <br />City Manager. Contractors should refer to the contract documents for bidding <br />information. <br />PROJECT TITLE:Steven Taylor Sanctity of Life Pavilion <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2022.034 <br />24-25.005 <br />QUANTITY ITEM COST <br />Copy of Steven Taylor Sanctity of Life Pavilion reviewed Page 1 of 5 Printed 5/12/2025 @ 1:48 PM
The URL can be used to link to this page
Your browser does not support the video tag.