My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250602
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 10:23:16 AM
Creation date
9/15/2025 2:40:16 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
6/2/2025
Retention
Perm
Document Relationships
Reso 2025-060 Raposo Engineering
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BID SUMMARY <br />BID OPENING Raposo Engineering, Inc. <br />DATE: May 8, 2025 2613 Erskine Lane <br />TIME: 3:00 pm Hayward, CA 94545 <br />LOCATION: City Clerk's Office Phone: (650) 622-6152 <br />ITEM <br />NO.ITEM UNIT COST ITEM COST UNIT COST <br />Prepared by: Adrian Toscano <br />Date Approved: 4/11/25 <br />PROJECT TITLE:Steven Taylor Sanctity of Life Pavilion <br />PROJECT NO.: <br />BID NO.: <br />ENGINEER'S ESTIMATE <br />2022.034 <br />24-25.005 <br />QUANTITY ITEM COST <br />TOTAL BASE BID:$208,553.00 $349,842.88 ** <br />BID ALTERNATE A <br />1A CONSTRUCTION SURVEYING PER <br />SECTION 2-9.2 <br />1 LS $2,805.00 $2,805.00 $12,000.00 $12,000.00 <br />2A CONCRETE WASHOUT AREA PER <br />SECTION 7-8.6 <br />250 SF $2.00 $500.00 $2.00 $500.00 <br />3A INLET PROTECTION PER SECTION <br />7-8.6 <br />1 EA $1,500.00 $1,500.00 $500.00 $500.00 <br />4A STABILIZED CONSTRUCTION <br />ENTRANCE/EXIT PER SECION 7-8.6 <br />800 SF $4.00 $3,200.00 $4.37 $3,496.00 ** <br />5A TEMPORARY CONSTRUCTION <br />FENCE WITH DUST CONTROL <br />SCREENS PER SECTION 7-8.6 <br />150 LF $5.00 $750.00 $16.00 $2,400.00 <br />6A FIBER ROLLS PER SECTION 7-8.6 182 LF $2.00 $364.00 $16.48 $2,999.36 ** <br />9A REMOVE EXISTING TREES PER <br />SECTION 300-1 <br />1 EA $2,500.00 $2,500.00 $5,000.00 $5,000.00 <br />10A CLEARING AND GRUBBING PER <br />SECTION 300-1 <br />1900 SF $1.00 $1,900.00 $14.50 $27,550.00 <br />11A ROUGH GRADING-CUT PER <br />SECTION 300-2 <br />1 LS $11,730.00 $11,730.00 $8,500.00 $8,500.00 <br />12A ROUGH GRADING-FILL PER <br />SECTION 300-4 <br />1 LS $5,100.00 $5,100.00 $7,500.00 $7,500.00 <br />24A IRRIGATION: SYSTEM & <br />MATERIALS PER SECTION 800-2 <br />1 LS $10,000.00 $10,000.00 $5,000.00 $5,000.00 <br />26A FINISH GRADING PER SECTION 801- <br />2 <br />300 SF $10.00 $3,000.00 $10.83 $3,249.00 <br />28A STABILIZED DECOMPOSED <br />GRANITE AT LABYRINTH PER <br />SECTION 302-17 <br />1900 SF $16.00 $30,400.00 $13.35 $25,365.00 <br />29A DG METAL HEADER AT LABYRINTH <br />PER SECTION 313 & 801-3 <br />208 LF $16.00 $3,328.00 $38.00 $7,904.00 <br />Copy of Steven Taylor Sanctity of Life Pavilion reviewed Page 3 of 5 Printed 5/12/2025 @ 1:48 PM
The URL can be used to link to this page
Your browser does not support the video tag.