My WebLink
|
Help
|
About
|
Sign Out
Home
5H Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5H Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:13:15 PM
Creation date
9/15/2025 4:49:00 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-079 Odin
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of San Leandro <br />City Council <br />Meeting Date: July 7, 2025 <br />Agenda Number: 5.h. <br />Agenda Section: CONSENT CALENDAR <br />File Number: 25-301 <br />File Type: Staff Report <br />Adopt a Resolution to Approve and Authorize the City Manager to Execute a $6,301,000 Construction <br />Contract with Odin Environmental Solutions, LLC for Water Pollution Control Plant (WPCP) <br />Sludge-Soil-Cement Stabilization and Fill, Project No. 2025.6020; to Authorize the City Manager to <br />Negotiate and Approve a Change Order of $337,500 for Bid Alternates A1 and A2; to Authorize the City <br />Manager to Negotiate and Approve Additional Change Orders up to a Cumulative Value not to Exceed <br />10% (or $630,100) of the Original Contract Amount; and to Appropriate an Additional $2,988,801 to the <br />Subject Project <br />COUNCIL PRIORITY <br />·Infrastructure <br />SUMMARY <br />This contract provides for the construction of the first of two phases of the Water Pollution Control <br />Plant (WPCP) Treatment Wetland Project. This phase will prepare the site for the final installation <br />of the project in a separate agreement. <br />RECOMMENDATIONS <br />Staff recommends the following actions: <br />·Approve a construction contract with Odin Environmental Solutions, LLC dba Odin in the <br />amount of $6,301,000 for WPCP Sludge-Soil-Cement Stabilization and Fill, Project No. <br />2025.6020 and authorize the City Manager to execute all documents and take all actions <br />necessary to effect the Resolution; and <br />·Authorize the City Manager to negotiate and approve a change order for Bid Alternates A1 <br />and A2 up to $337,500; and <br />·Authorize the City Manager to negotiate and approve change orders up to 10% (or <br />$630,100) of the original contract amount; and <br />·Appropriate an additional $2,988,801 to the subject project <br />BACKGROUND <br />This contract is for the first of two phases of the WPCP Treatment Wetland project. The purpose <br />of the Treatment Wetland project is to treat a portion of the WPCP discharge water to remove <br />nitrogen and other contaminates. In addition, the project will include enhancement of wetland <br />habitat along the San Francisco Bay Trail and serve as a demonstration project of cost-effective <br />nature-based solutions for contaminant removal . <br />The WPCP Treatment Wetland Project will utilize an existing, out of service treatment pond, to be <br />completed in two phases. The bottom level of the pond needs to be raised for final construction of <br />the project; there is currently a layer of sludge in the pond. The first phase will place soil stockpiled <br />from the 2014 WPCP upgrade project into the basin and mix with cement to stabilize the base <br />Page 1 City of San Leandro Printed on 9/4/2025
The URL can be used to link to this page
Your browser does not support the video tag.