My WebLink
|
Help
|
About
|
Sign Out
Home
5E Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250707
>
5E Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2025 1:11:01 PM
Creation date
9/15/2025 4:51:18 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/7/2025
Retention
Perm
Document Relationships
Reso 2025-088 Heron Bay Engineers Report
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
Reso 2025-089 Heron Bay Assessments
(Amended)
Path:
\City Clerk\City Council\Resolutions\2025
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />City of San Leandro Heron Bay Maintenance Assessment District No. 96-3 Page 4 <br />II. ESTIMATE OF COSTS <br />The cost of servicing, maintaining, repairing and replacing the improvements as described <br />in the Plans and Specifications are summarized as follows: <br /> <br />A. 2025/2026 District Budget <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />*Alameda County requires that assessments are divisible by two, therefore the Required Assessment may vary from <br />actual assessments applied on the county tax roll due to rounding. <br />ESTIMATED <br />COST <br />FISCAL YEAR <br />2025/2026 <br />DIRECT COSTS <br />Storm Water Facilities Maintenance <br />Storm water lift station and detention pond $46,494.00 <br />Storm water treatment pond in Phase 1B 10,206.00 <br />Maintenance of Buffer Area and Trail <br />Trail west of Phase 1B and 2B 104,615.90 <br />Trail north of Phase 2B and 3 94,409.47 <br />Rodent and Pest Control 0.00 <br />Tidal Marshlands Monitoring and Maintenance - All Marshes 0.00 <br />Maintenance of Lewelling Boulevard Improvements <br />Soundwalls east of SPRR 1,400.00 <br />Roundabout to Wicks 38,274.11 <br />Roundabout west to SPRR 17,861.25 <br />Tide Gate Maintenance 50,000.00 <br />DIRECT COSTS SUBTOTAL $363,260.72 <br />CAPITAL IMPROVEMENT PROJECTS <br />Shoreline Trail Repairs $60,280.00 <br />Hydrology Study $0.00 <br />CAPITAL IMPROVEMENTS PROJECTS SUBTOTAL $60,280.00 <br />ADMINISTRATION COSTS <br />City, Engineering, Legal, Consultant, Insurance $180,439.77 <br />ADMINISTRATION SUBTOTAL $180,439.77 <br />LEVY BREAKDOWN <br />Total Direct, Capital and Admin Costs $603,980.49 <br />Operating Reserve Collection 0.00 <br />TOTAL COSTS $603,980.49 <br />LEVY ADJUSTMENTS <br />Estimated Reserve Contribution ($152,919.61) <br />Reserve Replenishment 59,998.48 <br />TOTAL LEVY ADJUSTMENTS ($92,921.13) <br />REQUIRED ASSESSMENT $511,059.36 <br />DESCRIPTION
The URL can be used to link to this page
Your browser does not support the video tag.