Laserfiche WebLink
Page 25 of 25 <br />Alameda CTC Annual Paratransit Program Plan Application <br />Application Period: July 1, 2025 - June 30, 2026 <br /> <br />Alameda CTC FY2025-26 Annual Paratransit Program Plan Application (July 1, 2025 – June 30, 2026) <br />Attachment Table D: Vehicle Fleet <br /> <br /> <br />Column A Column B Column C Column D Column E Column F Column G Column H Column I Column J <br />Make <br />Type of <br />Vehicle(s) <br />(specify bus, <br />large van, <br />minivan, <br />sedan) <br />Year of <br />Vehicle Fuel Type <br />Lift/Ramp <br />Equipment <br />(specify lift, <br />ramp, or <br />none) <br />Ambulatory Wheelchair <br />Number <br />of <br />Vehicles <br />Owner <br />(specify if <br />contractor) <br />City that <br />vehicle(s) <br />are <br />garaged <br />FORD Bus 2013 GAS LIFT 14 5 1 MV Trans San Leandro <br />FORD Bus 2013 GAS LIFT 14 5 1 MV Trans San Leandro <br />FORD Bus 2021 GAS LIFT 14 4 1 MV Trans San Leandro <br />FORD Bus 2021 GAS LIFT 14 4 1 MV Trans San Leandro <br />Vehicle Fleet <br />Vehicle Capacity