My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250721
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:02:34 AM
Creation date
9/16/2025 10:02:02 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/21/2025
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OVERVIEW <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for San Leandro use only. Page 2 of 57 <br />SSMP Organization <br />This SSMP is organized into 11 core elements following Attachment D of the WDR, with inclusion of applicable <br />Specifications requirements. <br />Each individual element in the SSMP includes the following technical contents. <br />1. Requirements – Provides the actual description of applicable requirements in the WDR. <br />2. Compliance – Describes the City’s approach to complying with the WDR requirements. <br />3. Effectiveness – As measured by Key Performance Indicators (KPIs.) <br />4. Implementation – Demonstrates how the City will ensure the SSMP will be carried out as described. <br />5. Resilience – Demonstrates the resilience that is addressed in the SSMP and built-in to the City’s collection <br />system and procedures. <br />6. Appendix Inclusions – List the items included in the Appendix for each SSMP Element, if any. <br />
The URL can be used to link to this page
Your browser does not support the video tag.