Laserfiche WebLink
GOAL AND INTRODUCTION <br /> <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for San Leandro use only. Page 4 of 57 <br />1. Goal and Introduction <br />WDR REQUIREMENTS <br />Att. D-1 (pg. D-2) <br />“The goal of the Sewer System Management Plan (Plan) is to provide a plan and schedule to: (1) properly <br />manage, operate, and maintain all parts of the Enrollee’s sanitary sewer system(s), (2) reduce and <br />prevent spills, and (3) contain and mitigate spills that do occur. <br />The Plan must include a narrative Introduction section that discusses the following items:” <br />1.1. Regulatory Context <br />WDR REQUIREMENTS <br />Att. D-1.1 (pg. D-2) <br />“The Plan Introduction section must provide a general description of the local sewer system <br />management program and discuss Plan implementation and updates”. <br />COMPLIANCE <br />The City is committed to fully implementing the WDR which includes addressing all requirements by <br />integrating a wide range of programs specifically designed for ensuring the integrity and efficiency of the <br />City’s sanitary sewer collection system. Moreover, the City is dedicated to maintaining its collection system <br />in a systematic manner by implementing various work programs, with a focus on critical areas, to prevent <br />spills, allowing for a comprehensive approach to maintenance. Work programs include CCTV inspections, <br />pipe cleaning, manhole inspections, pump station maintenance, root control, and source control, just to <br />name a few. Work programs are described in more detail in Specifications 5.19 – Operation and <br />Maintenance of this SSMP. <br />By prioritizing proactive measures and taking a comprehensive approach, the City is well-equipped with a <br />proven track record of effectively operating its sanitary sewer collection system with the highest levels of <br />service, complying with the WDR, and reducing/eliminating sewage spills. <br />EFFECTIVENESS <br />N/A <br />IMPLEMENTATION PLAN/SCHEDULE <br />N/A