My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250721
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:02:34 AM
Creation date
9/16/2025 10:02:02 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/21/2025
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GOAL AND INTRODUCTION <br /> <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for San Leandro use only. Page 8 of 57 <br /> The City maintains up to date maps of its collection system. <br /> <br />Use Type Number or % of Connections <br />Residential unknown <br />Commercial unknown <br />Industrial unknown <br />Total Approximately 1,200 <br />EFFECTIVENESS <br />The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element: <br />• Are asset statistics periodically reviewed and updated as necessary? <br />• Are omissions or errors addressed in a timely manner? <br />• Are system maps up to date? <br /> <br />Figure 3 - City Vicinity Map and Service Area <br />Table 2 - City sewer connection flow classifications and connections data
The URL can be used to link to this page
Your browser does not support the video tag.