Laserfiche WebLink
GOAL AND INTRODUCTION <br /> <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for San Leandro use only. Page 11 of 57 <br />Specifications 5.7 – Allocation of Resources <br />WDR REQUIREMENTS <br />Specification. 5.7 (pg. 22) <br />“The Enrollee shall comply with the following requirements: <br />• Establish and maintain a means to manage all necessary revenues and expenditures related to <br />the sanitary sewer system; and <br />• Allocate the necessary resources to its sewer system management program for: <br />• Compliance with this General Order, <br />• Full implementation of its updated Sewer System Management Plan, <br />• System operation, maintenance, and repair, and <br />• spill responses.” <br />COMPLIANCE <br />In 2024, the City's Water Pollution Control Division completed a Needs Assessment to better understand <br />the projects required to maintain the City's wastewater infrastructure. The City's Water Pollution Control <br />Plant went into operation in 1939 and most recently completed an upgrade in 2017. The sewer collections <br />system which includes 125 miles of sewer pipeline and 12 lift stations throughout the service area is also in <br />need of maintenance and upgrades. The Capital Improvement Program (CIP) for Wastewater Treatment <br />and Collections 10 Year Plan was presented to and approved by City Council at the October 21st, 2024 City <br />Council Meeting. <br />The City hired Bartle Wells Associates to perform a Sewer Rate Study to evaluate and project financial <br />requirements in order to operate and maintain the wastewater system. This study took into consideration <br />the proposed CIP costs, increases in operational costs, as well as costs that will be incurred due to new state <br />regulations to propose rates to adequately meet needs. A Proposition 218 rate increase was completed <br />and finalized in June 2025. New rates will be effective after July 1, 2025, and will increase each subsequent <br />year until 2029. <br />The City relies almost entirely on revenues from wastewater rates to fund the costs of providing wastewater <br />service. As such, wastewater rates must be set at levels adequate to fund the costs of operating and <br />maintaining the wastewater system, fund necessary capital improvements to keep the wastewater system <br />in good operating condition and pay for debt service. A secondary source of revenue is from capacity fees <br />that funds the installation of facilities to areas not yet served and to upsize pipes to ensure adequate <br />capacity and other capital needs. <br />The Proposition 218 increase in funding will allow the budget for sewer repair and replacement to increase <br />from $750,000 annually to $2,100,000 annually. The City is generally adequately staffed, although there is <br />one collection system vacancy as of mid-2025. The City is in the process of replacing its vac truck and <br />otherwise owns and operates the necessary equipment to effectively maintain its collection system. <br /> <br /> <br /> <br />