My WebLink
|
Help
|
About
|
Sign Out
Home
5C Consent
CityHall
>
City Clerk
>
City Council
>
Agenda Packets
>
2025
>
Packet 20250721
>
5C Consent
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/16/2025 10:02:34 AM
Creation date
9/16/2025 10:02:02 AM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
7/21/2025
Retention
Perm
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
92
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
OPERATIONS AND MAINTENANCE PROGRAM <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for San Leandro use only. Page 29 of 57 <br />4.4. Equipment Inventory <br />WDR REQUIREMENTS <br />Att. D-4.4 (pg. D-5) <br />“An inventory of sewer system equipment, including the identification of critical replacement and spare <br />parts.” <br />COMPLIANCE <br />The City has the following equipment available for emergency operations and collection system <br />maintenance: <br />• 1 truck-mounted continuous rodder • 1 combination cleaning truck <br />• 1 hydro jet cleaning truck • 1 closed circuit television truck <br />• 2 emergency response trucks • 1 emergency response trailer <br />• 1 lift station response truck • 2 mobile emergency bypass pump trailers <br />The City’s lift stations incorporate a two-pump design to provide for seamless operation in the event of a <br />pump failure. All lift stations are part of a SCADA network with remote alarm capability. All lift stations have <br />a replacement pump in stock. <br />Except for regularly manned, securable, low flow facilities, all lift stations are fitted with a bypass pump <br />connection, portable generator connection, and/or a permanent emergency generator set. The City <br />maintains a fleet of portable diesel trash pumps and generators in sufficient quantity that a City-wide event <br />would not prevent transmission of sewage to the plant. <br />Each lift station has a posted plan informing responders of specific contingency equipment to be used in <br />case of failure of electrical or mechanical systems. The City has also created a lift station response and <br />training manual detailing the use of contingency equipment in both individual and City-wide failure <br />situations. <br />All contingency equipment is kept in top working order including regularly scheduled maintenance and <br />monthly run tests. The City keeps large stocks of onsite diesel fuel, hoses, tow vehicles and fittings to <br />facilitate a rapid and appropriate response. The City’s Emergency Response Trailer contains the following <br />critical replacement and spare parts: <br />
The URL can be used to link to this page
Your browser does not support the video tag.