SYSTEM EVALUATION, CAPACITY ASSURANCE, CAPITAL IMPROVEMENTS <br />© 2025 Fischer Compliance, LLC. All rights reserved. Sewer System Management Plan licensed for San Leandro use only. Page 48 of 57 <br />8.4. Capital Improvement Plan <br />WDR REQUIREMENTS <br />Attachment D-8.4 (pg. D-9) <br />“The capital improvement plan must include the following items: <br />• Project schedules include completion dates for all portions of the capital improvement program; <br />• Internal and external project funding sources for each project; and <br />• Joint coordination between operation and maintenance staff, and engineering staff/consultants <br />during planning, design, and construction of capital improvement projects; and Interagency <br />coordination with other impacted utility agencies.” <br />COMPLIANCE <br />The 2015 Master Plan includes a recommended Capital Improvement Program (CIP), designed to provide <br />adequate sewer capacity for current and future flows. In addition to projects required to address capacity <br />criteria violations, the recommended CIP also includes several projects that address surcharge conditions <br />predicted by the model. The recommended capacity improvements are found in Table ES-2 of the Master <br />Plan. <br />In 2021, the City completed a $1.9 million point source repair project and in 2024, the City completed a $1.8 <br />million point repair project and lift station vault lid project. <br />The City’s more recent CIP planning relies on data from both the Master Plan and internal inspections, which <br />are used to compile and prioritize capital projects. These projects are then scheduled as part of the two- <br />year budget process. Point repairs are made soon after discovery and are frequently re-prioritized to insure <br />uninterrupted sewer service. <br />In 2024, the City's Water Pollution Control Division completed a Needs Assessment to better understand <br />the projects required to maintain the City's wastewater infrastructure The Capital Improvement Program <br />(CIP) for Wastewater Treatment and Collections 10 Year Plan was presented to and approved by City Council <br />at the October 21st, 2024 City Council Meeting. As a result of the June 2025 Proposition 2018 rate increase, <br />the City’s annual budget for point repairs, line replacement and other upgrades will be approximately <br />$2,500,000 per year. <br />The City intends to complete the following projects in FYs 2025 through 2027: <br />• Davis Street manhole replacement, which will replace the influent structure coming into the WQCP; <br />• San Rafael Lift Station upgrade, which will include installing a bypass valve and CIPP lining the force <br />main; <br />• Annual point repairs in FY 2025, 2026, and 2027; and <br />• Replacement or CIPP lining for Floresta/Anza Way line. <br />EFFECTIVENESS <br />The City utilizes the following Key Performance Indicators for measuring effectiveness of this Element: <br />• Has the City’s capital improvement plan schedule been adhered to? <br />