My WebLink
|
Help
|
About
|
Sign Out
Home
Eden Road Public Improvement Agreement
CityHall
>
City Clerk
>
City Council
>
Recorded Documents
>
2025
>
Eden Road Public Improvement Agreement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2025 4:52:11 PM
Creation date
9/22/2025 4:51:57 PM
Metadata
Fields
Template:
CM City Clerk-City Council
Document Date (6)
3/19/2024
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Furthermore, Eden Road shall be maintained at a Pavement Condition Index ("PCI") level of <br />65 or greater, in perpetuity. Owners commit to making available to the City of San Leandro <br />upon request and not more frequently than on an annual basis reports prepared by a third -party <br />with relevant expertise affirming the PCI rating. To the extent the condition of the road is ever <br />determined to have degraded below a PCI of 65, Applicant acknowledges that it shall be deemed <br />to have violated the terms of this agreement and with the anticipated terms of its Conditional <br />Use Permit, which could result in the rescission of the aforementioned Conditional Use Permit <br />#PLN21-0027. <br />6 (a). City Contribution Towards Road Maintenance Costs. As a result of the public benefits <br />derived from retaining access rights across the PUE, City agrees to reimburse the Owner of <br />Eden Road towards 10% of the long-term maintenance costs of the road. Owner shall provide <br />a minimum of 30-days advance notice to the City of any prospective maintenance work for the <br />City's review and approval prior to the commencement of any such maintenance work, and <br />receipts shall be submitted to the City for reimbursement of 10% of those costs once such work <br />is completed. Owner shall be responsible for ensuring any such work complies with relevant <br />public contracting code and/or prevailing wage requirements and shall defend and indemnify <br />the City in the event of any legal challenges directly stemming from such maintenance activities. <br />To the extent any future damage to the road following completion of the project can be clearly <br />identified as being caused from the operations of any particular party with frontage or access <br />rights across Eden Road, then that party shall be exclusively responsible for all costs associated <br />with repairing said damaged sections of the road. <br />Soil TestinLy: As a privately owned road purchased as -is, where -is, the Owner and/or <br />Applicant will be allowed to test the soil to determine its makeup for disposal purposes. <br />Utility Lines: City will be responsible for any City utility lines that existed on Eden Road <br />prior to the start of construction of this Project, including a sewage line ("Existing Line(s)"). If <br />the City determines there is a need for any repair or replacement of Existing Lines or if a need <br />for new City utility line(s) occurs in the future, it shall be the City's sole responsibility and cost <br />to conduct such repair, replacement, or installation of such utility line(s) or related infrastructure, <br />and the City shall repair any damage to Eden Road caused by said work, including restoring the <br />EDEN ROAD PUBLIC IMPROVEMENT AGREEIvfENT Page 6 of I I <br />
The URL can be used to link to this page
Your browser does not support the video tag.