Laserfiche WebLink
Page 13 of 68 <br /> <br />system installation. Shop drawings shall contain all information as required by the <br />referenced installation standards in Chapter 9. <br /> <br />107.1.2 Means of egress. <br /> <br />The construction documents shall show in sufficient detail the location, construction, size <br />and character of all portions of the means of egress in compliance with the provisions of this <br />Code. In other than occupancies in Groups R-2, R-3, and I-1, the construction documents <br />shall designate the number of occupants to be accommodated on every floor, and in all <br />rooms and spaces. <br /> <br />107.1.3 Exterior wall envelope. <br /> <br />Construction documents for all buildings shall describe the exterior wall envelope in <br />sufficient detail to determine compliance with this Code. The construction documents shall <br />provide details of the exterior wall envelope as required, including flashing, intersections <br />with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or <br />parapets, means of drainage, water-resistive membrane and details around openings. <br /> <br />The construction documents shall include manufacturer’s installation instructions that <br />provide supporting documentation that the proposed penetration and opening details <br />described in the construction documents maintain the weather resistance of the exterior wall <br />envelope. The supporting documentation shall fully describe the exterior wall system which <br />was tested, where applicable, as well as the test procedure used. <br /> <br />107.2 Site plan. <br /> <br />The construction documents submitted with the application for permit shall be accompanied <br />by a site plan showing to scale the size and location of new construction and existing <br />structures on the site, distances from lot lines, the established street grades and the proposed <br />finished grades and, as applicable, flood hazard areas, floodways, and design flood <br />elevations; and it shall be drawn in accordance with an accurate boundary line survey. In the <br />case of demolition, the site plan shall show construction to be demolished and the location <br />and size of existing structures and construction that are to remain on the site or plot. The <br />Building Official is authorized to waive or modify the requirement for a site plan when the <br />application for permit is for alteration or repair or when otherwise warranted. <br /> <br />107.3 Examination of documents. <br /> <br />The Building Official shall examine or cause to be examined the accompanying <br />construction documents and shall ascertain by such examinations whether the construction <br />indicated and described is in accordance with the requirements of this Code and other <br />pertinent laws or ordinances. <br /> <br />107.3.1 Approval of construction documents. <br />Resolution No. 2025-152