My WebLink
|
Help
|
About
|
Sign Out
Home
Reso 2025-152 Building Code Findings
CityHall
>
City Clerk
>
City Council
>
Resolutions
>
2025
>
Reso 2025-152 Building Code Findings
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2025 5:02:58 AM
Creation date
11/26/2025 5:01:58 AM
Metadata
Fields
Template:
CM City Clerk-City Council
CM City Clerk-City Council - Document Type
Resolution
Document Date (6)
11/17/2025
Retention
PERM
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 16 of 68 <br /> <br />108.3 Temporary power. <br /> <br />The Building Official is authorized to give permission to temporarily supply and use power <br />in part of an electric installation before such installation has been fully completed and the <br />final certificate of completion has been issued. The part covered by the temporary certificate <br />shall comply with the requirements specified for temporary lighting, heat or power in the <br />Electrical Code. <br /> <br /> <br /> <br /> <br /> <br />108.4 Termination of approval. <br /> <br />The Building Official is authorized to terminate such permit for a temporary structure or use <br />and to order the temporary structure or use to be discontinued. <br /> <br />SECTION 109 <br />FEES <br />109.1 Payment of fees. <br /> <br />A permit shall not be valid until the fees prescribed by law have been paid, nor shall an <br />amendment to a permit be released until the additional fee, if any, has been paid. <br /> <br />Fees shall be assessed for permits and associated plan review in accordance with the fee <br />schedule established by the San Leandro City Council as set forth in Chapter 4 of the San <br />Leandro Administrative Code. <br /> <br />109.2 Permit fees. <br /> <br />1. General: Fees shall be assessed in accordance with the provisions of this section. <br /> <br />2. Permit Fees: The fee for each permit shall be as set forth in this section. The determination <br />of value or valuation under any of the provisions of this Code shall be made by the Building <br />Official. The value to be used in computing the building permit and building plan review fees <br />shall be the total value of all construction work for which the permit is issued as well as all finish <br />work, painting, roofing, electrical, plumbing, heating, air conditioning, elevators, fire- <br />extinguishing systems and other permanent equipment. <br /> <br />3. Plan Review Fees: When submittal documents are required by Section 107.1, a plan review <br />shall be paid at the time of submitting the submittal documents for plan review. Said plan review <br />fee shall be eighty percent (80%) of the building permit fee as set forth in the applicable fee <br />schedule resolution adopted by the City Council. <br />Resolution No. 2025-152
The URL can be used to link to this page
Your browser does not support the video tag.